Grenergy USA
Independent power producer
Key facts
Independent power producer · 20 MW- Capacity held
- 20MW
- Assets
- 2
- Projects
- 1
- States
- TX
- Registered in
- United States
- Parent
- No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why
Projects 1
Capacity
0.11 GW
none active
1 no longer listedNo longer listedThis project was last stated as active but is no longer listed in any register, so it is not counted as active.
| Status | Name. Sort by name, A to Z | Type | MW, sorted descending. Sort by capacity, smallest first | State | Online. Sort by proposed online date, latest first | Source |
|---|---|---|---|---|---|---|
| Studied | Coyote Ridge BESS | Storage | 111.1 MW | TX | Online 6 Oct 2027 | ERCOT |
Assets 2
Assets
2
Capacity
20.0 MW
- Storage: 20.0 MW, 2 assets
Operates 2 power plants
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Held by |
|---|---|---|---|---|---|
| BESS La Feria | Storage | Operates | 10 MW | US-TX | Grenergy USA |
| BESS Stadium | Storage | Operates | 10 MW | US-TX | Grenergy USA |
Sources 2
Registers
2
Reuse terms
- 2 Open license
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
ERCOT ·
ERCOT GIS Report (Generator Interconnection Status)
ERCOT Website User Agreement clause 5, retrieved 2026-09-12 — "raw data provided in public portions of this website may be used, reproduced, and redistributed in compilations, charts, and analyses without maintaining such notices"
Around this company
Nearby 6
within 25 kmProjects
6
within 25 km
Nearest
2.3 km
Mesquite Clean Energy Center (BESS)
All 6NearbyShowing all 6 nearby projects.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Under construction | Mesquite Clean Energy Center (BESS) | Storage | 10.1 MW | 2.3 km away | nearest: BESS La Feria |
| Studied | Accalia Point Solar, LLC | Solar | 190.5 MW | 3.3 km away | nearest: BESS La Feria |
| Under construction | Harlingen #1 BESS 1 | Storage | 10 MW | 14.3 km away | nearest: BESS La Feria |
| Contracted | Orange Grove | Storage | 61.4 MW | 20.5 km away | nearest: BESS Stadium |
| Studied | Aegle Power | Gas, combined cycle | 1,536.4 MW | 21.4 km away | nearest: BESS La Feria |
| Filed | Proposed Digital Infrastructure Facility (Harlingen data centre) | Large load | — | 23.0 km away | nearest: BESS La Feria |