Amager power station — Power plant · BiomassSoutheast Nees wind farm — Power plant · WindThorsminde wind farm — Power plant · Wind · Vestas Wind SystemsKorsnakke wind farm — Power plant · WindRødbyhavn wind farm — Power plant · WindFjerritslev solar farm — Power plant · SolarNees Hede hybrid solar wind project solar farm -- — Announced · Solar · Denmark · 140 MW · 0.5 km awaySjollen wind farm -- — Announced · Offshore wind · Sweden · 300 MW · 15.7 km awayLundåkra wind farm RP1 — Announced · Wind · Sweden · 21 MW · 24.9 km away
  • Wind & solar
  • Bioenergy
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Power plant owner

As filed: HOFOR A/S

Key facts

Power plant owner · 329 MW
Assets
6
Projects
2
Registered in
United States
Parent
HOFOR Forsyning Holding P/SOwnership claimOwnership link recorded from its source; no date stated by the source.

Assets 6

Assets

6

Capacity

329 MW

MW by fuel
  1. Biomass: 218 MW, 1 asset
  2. Wind: 82.0 MW, 4 assets
  3. Solar: 29.0 MW, 1 asset

Owns 6 power plants

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Share Held by
Amager power station Biomass Owns 218 MW — 100.0% HOFOR A/S
Rødbyhavn wind farm Wind Owns 29 MW — 100.0% HOFOR A/S
Fjerritslev solar farm Solar Owns 29 MW — — HOFOR A/S
Southeast Nees wind farm Wind Owns 21 MW — — HOFOR A/S
Korsnakke wind farm Wind Owns 21 MW — 100.0% HOFOR A/S
Thorsminde wind farm Wind Owns 11 MW — 100.0% HOFOR A/S

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 3

within 25 km

Projects

3

within 25 km

Nearest

0.5 km

Nees Hede hybrid solar wind project solar farm --

All 3NearbyShowing all 3 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Announced Nees Hede hybrid solar wind project solar farm -- Solar 140 MW 0.5 km away nearest: Southeast Nees wind farm
Announced Sjollen wind farm -- Offshore wind 300 MW 15.7 km away nearest: Amager power station
Announced Lundåkra wind farm RP1 Wind 21 MW 24.9 km away nearest: Amager power station

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution