Holding Slovenske elektrarne doo
Power plant owner
Key facts
Power plant owner · 1,412 MW- Capacity held
- 1,412MW
- Assets
- 8
- Projects
- 1
- Companies below
- 2
- Registered in
- United States
- Parent
- No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why
Projects 1
Capacity
0.04 GW
0.04 GW active
Including subsidiaries
| Status | Name. Sort by name, A to Z | Type | MW, sorted descending. Sort by capacity, smallest first | State | Company | Online. Sort by proposed online date, latest first | Source |
|---|---|---|---|---|---|---|---|
| Announced | Suhadol hydroelectric plant | Hydro | 39 MW | Slovenia | Holding Slovenske elektrarne doo | — | Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) |
Sources GEM
Assets 8
Assets
8
Capacity
1,412 MW
- Coal: 1,154 MW, 2 assets
- Hydro: 156 MW, 4 assets
- Storage: 102 MW, 2 assets
Owns 8 power plants
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Share | Held by |
|---|---|---|---|---|---|---|
| Sostanj power station | Coal | Owns | 1,029 MW | — | 100.0% | Termoelektrarna Šoštanj doo |
| Trbovlje power station | Coal | Owns | 125 MW | — | 100.0% | Termoelektrarne Trbovlje doo |
| Doblar hydroelectric plant | Storage | Owns | 70 MW | — | 100.0% | Holding Slovenske elektrarne doo |
| Brežice hydroelectric plant | Hydro | Owns | 45 MW | — | 49.0% | Holding Slovenske elektrarne doo |
| Krško hydroelectric plant | Hydro | Owns | 39 MW | — | 49.0% | Holding Slovenske elektrarne doo |
| Arto-Blanca hydroelectric plant | Hydro | Owns | 39 MW | — | 49.0% | Holding Slovenske elektrarne doo |
| Boštanj hydroelectric plant | Hydro | Owns | 33 MW | — | 49.0% | Holding Slovenske elektrarne doo |
| Solkan hydroelectric plant | Storage | Owns | 32 MW | — | 100.0% | Holding Slovenske elektrarne doo |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Ownership 3
Companies
3
this one included
Parents
0
Subsidiaries
2
direct
Holding assets
3
of 3 companies in the group
-
Holding Slovenske elektrarne doo This company 7 assets1,287 MWwith the companies below
-
Termoelektrarna Šoštanj doo Subsidiary · share not stated 1 asset1,029 MW
-
Termoelektrarne Trbovlje doo Subsidiary · share not stated 0 assets
-
The same companies as a table, with each ownership claim
| Company. Sort by company, A to Z | Relationship, sorted ascending. Sort by relationship, subsidiaries first | Assets. Sort by assets held, largest first | Asset types |
|---|---|---|---|
| Holding Slovenske elektrarne doo | This company | 6 | power plant |
| Termoelektrarne Trbovlje doo | Subsidiary | 1 | power plant |
| Termoelektrarna Šoštanj doo | Subsidiary | 1 | power plant |
Sources 1
Registers
1
Reuse terms
- 1 Open license, with credit
Latest read
2026-10-26
From its recordsSourcesThe registers behind this company's assets, projects and RFPs; the company record itself is derived from them.
Sources
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 5
within 25 kmProjects
5
within 25 km
Nearest
3.9 km
Kanalski Vrh solar farm 2
All 5NearbyShowing all 5 nearby projects.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Announced | Kanalski Vrh solar farm 2 | Solar | 5.1 MW | 3.9 km away | nearest: Doblar hydroelectric plant |
| Announced | Krško nuclear power plant 2 | Nuclear | 1,100 MW | 4.8 km away | nearest: Krško hydroelectric plant |
| Announced | Mokrice hydroelectric plant | Hydro | 28 MW | 7.1 km away | nearest: Brežice hydroelectric plant |
| Canceled | Monfalcone power station Unit 5 | Coal | 340 MW | 22.4 km away | nearest: Solkan hydroelectric plant |
| Under construction | Monfalcone power station CC1, timepoint 1 | Gas, combined cycle | 860 MW | 22.4 km away | nearest: Solkan hydroelectric plant |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.