IMTT-RICHMOND, RICHMOND — Petroleum product terminalRichmond Cogen — Postponed · Gas, combined cycle · CA · 43 MW · 1.7 mi awaySan Francisco Electric Reliability Proj — Withdrawn · Gas, combustion turbine · CA · 151.5 MW · 9.7 mi away
  • Other infrastructure
  • 10 · 100 · 1,000 MW

IMTT-Richmond

Follow this company

Petroleum product terminal owner

As filed: IMTT-RICHMOND

Key facts

Petroleum product terminal owner · 0 projects
Projects
0projects
Assets
1
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Assets 1

Assets

1

Assets by type
  1. Petroleum product terminal: 1 assets, 1 asset

Owns 1 petroleum product terminal

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z State. Sort by state, A to Z Held by
IMTT-RICHMOND, RICHMOND Petroleum product terminal Owns US-CA IMTT-RICHMOND

Sources EIA Energy Atlas

Sources

  • EIA Energy AtlasOpen license · retrieved Nov 13, 2026Source: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Terminals (as of September 2021)

Every source and license · Attribution

Around this company

Nearby 2

within 15 mi

Projects

2

of 3 before the technology filter

Nearest

1.7 mi

Richmond Cogen

2 of 3 · gas, oil and hydrogen technologiesNearbyShowing 2 of 3 nearby projects, narrowed to gas, oil and hydrogen technologies because this company operates oil or liquids infrastructure. Show all 3

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Richmond Cogen Gas, combined cycle 43 MW 1.7 mi away nearest: IMTT-RICHMOND, RICHMOND
Withdrawn San Francisco Electric Reliability Proj Gas, combustion turbine 151.5 MW 9.7 mi away nearest: IMTT-RICHMOND, RICHMOND

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO

Every source and license · Attribution