INTERCONTINENTAL TERMINALS CO, DEER PARK — Petroleum product terminalINTERCONTINENTAL TERMINALS COMPANY, ITC PASADENA — Petroleum product terminalTexas Petrochemicals — Postponed · Gas, combined cycle · TX · 560 MW · 5.5 mi awayNET Power La Porte Station — Studied · Gas, combustion turbine · TX · 25.5 MW · 6.0 mi awayGreens Bayou 6 — Under construction · Gas, combustion turbine · TX · 445 MW · 8.0 mi awayCedar Bayou 5 — Under construction · Gas, combustion turbine · TX · 697 MW · 10.2 mi awayCPV Pondera King Energy Center — Postponed · Gas, combined cycle · TX · 900 MW · 13.8 mi away
  • Other infrastructure
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Intercontinental Terminals CO

Follow this company

Petroleum product terminal owner

As filed: INTERCONTINENTAL TERMINALS CO

Key facts

Petroleum product terminal owner · 0 projects
Projects
0projects
Assets
2
States
TX
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,120 of 50,273 companies here. Why

Assets 2

Assets

2

Assets by type
  1. Petroleum product terminal: 2 assets, 2 assets

Owns 2 petroleum product terminals

Sources EIA Energy Atlas

Sources

  • EIA Energy AtlasOpen license · retrieved Nov 9, 2026Source: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Terminals (as of September 2021)

Every source and license · Attribution

Around this company

Nearby 5

within 15 mi

Projects

5

of 11 before the technology filter

Nearest

5.5 mi

Texas Petrochemicals

5 of 11 · gas, oil and hydrogen technologiesNearbyShowing 5 of 11 nearby projects, narrowed to gas, oil and hydrogen technologies because this company operates oil or liquids infrastructure. Show all 11

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Texas Petrochemicals Gas, combined cycle 560 MW 5.5 mi away nearest: INTERCONTINENTAL TERMINALS COMPANY, ITC PASADENA
Studied NET Power La Porte Station Gas, combustion turbine 25.5 MW 6.0 mi away nearest: INTERCONTINENTAL TERMINALS CO, DEER PARK
Under construction Greens Bayou 6 Gas, combustion turbine 445 MW 8.0 mi away nearest: INTERCONTINENTAL TERMINALS COMPANY, ITC PASADENA
Under construction Cedar Bayou 5 Gas, combustion turbine 697 MW 10.2 mi away nearest: INTERCONTINENTAL TERMINALS CO, DEER PARK
Postponed CPV Pondera King Energy Center Gas, combined cycle 900 MW 13.8 mi away nearest: INTERCONTINENTAL TERMINALS COMPANY, ITC PASADENA

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Every source and license · Attribution