- Other infrastructure
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Other infrastructure
- Other companies nearby
13 assets
13 assets. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Marathon PIPE Line
Petroleum product pipeline operator
As filed: MARATHON PIPE LINE
Key facts
Petroleum product pipeline operator · 2,907 miles- Pipeline and line held
- 2,907miles
- Assets
- 13
- States
- AR, IL, IN, KY, LA, MI and more
- Registered in
- United States
- Website
- marathonpipeline.com Source: Wikidata
- Parent
- No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why
Assets 13
Assets
13
- Petroleum product pipeline: 13 assets, 13 assets
Operates 13 petroleum product pipelines
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | Miles. Sort by length, largest first | State. Sort by state, A to Z | Held by |
|---|---|---|---|---|---|
| Centenial Pipeline | Petroleum product pipeline | Operates | 774 miles | US-AR, US-IL, US-KY, US-LA, US-MS, US-TN, US-TX | MARATHON PIPE LINE |
| Robinson - Lima | Petroleum product pipeline | Operates | 477 miles | US-IL, US-IN, US-OH | MARATHON PIPE LINE |
| Wabash 12in Products | Petroleum product pipeline | Operates | 81 miles | US-IL | MARATHON PIPE LINE |
| Two Rivers | Petroleum product pipeline | Operates | 189 miles | US-IL, US-IN | MARATHON PIPE LINE |
| Kenova - Columbus | Petroleum product pipeline | Operates | 131 miles | US-KY, US-OH | MARATHON PIPE LINE |
| Heath - Findlay | Petroleum product pipeline | Operates | 95 miles | US-OH | MARATHON PIPE LINE |
| Heath - Dayton | Petroleum product pipeline | Operates | 94 miles | US-OH | MARATHON PIPE LINE |
| East Sparta - Heath | Petroleum product pipeline | Operates | 134 miles | US-OH, US-PA | MARATHON PIPE LINE |
| Robinson - Louisville - Lexington | Petroleum product pipeline | Operates | 189 miles | US-IL, US-IN, US-KY | MARATHON PIPE LINE |
| Toledo - Steubenville | Petroleum product pipeline | Operates | 49 miles | US-OH, US-WV | MARATHON PIPE LINE |
| Wabash 12in Product | Petroleum product pipeline | Operates | 398 miles | US-IL, US-IN, US-MI | MARATHON PIPE LINE |
| Wood River - Clermont | Petroleum product pipeline | Operates | 255 miles | US-IL, US-IN | MARATHON PIPE LINE |
| Creal Springs - Martinsville | Petroleum product pipeline | Operates | 42 miles | US-IL | MARATHON PIPE LINE |
Sources EIA Energy Atlas
Sources
- EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)Source: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Pipelines (as of January 2020)
Sources 2
Registers
2
Reuse terms
- 2 Open license
Latest read
2026-11-09
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
EIA Energy Atlas ·
EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Source: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Pipelines (as of January 2020) · license
EIA Copyrights and Reuse, https://www.eia.gov/about/copyrights_reuse.php (READ 2026-10-25, HTTP 200; quoted on us.eia.atlas.crude_oil_pipelines): "U.S. government publications are in the public domain and are not subject to copyright protection. You may use and/or distribute any of our data, files, databases ... you should use an acknowledgment, which includes the publication date". The layer's own metadata (PetroleumProduct_Pipelines_US_202001.shp.xml, READ 2026-10-25) useLimit: "None (public use). Users are advised to thoroughly review the metadata to understand the appropriate use and limitations of the data . These data and related graphics, if available, are not legal documents and are not intended to be used as such."; idCredit "U.S. Energy Information Administration". Atlas item licenseInfo not readable (Token Required; no public item).
Summary only: the source’s license keeps the full record at the source.
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 18
within 25 kmProjects
18
of 158 before the technology filter
Nearest
0.2 km
Sycamore Riverside Energy, LLC
18 of 158 · gas, oil and hydrogen technologiesNearbyShowing 18 of 158 nearby projects, narrowed to gas, oil and hydrogen technologies because this company operates oil or liquids infrastructure. Show all 158
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Announced | Sycamore Riverside Energy, LLC | Gas, combustion turbine | 964 MW | 0.2 km away | nearest: Robinson - Lima |
| Announced | Richland Parish Power Station 4 | Gas, combined cycle | 780.3 MW | 2.5 km away | nearest: Centenial Pipeline |
| Announced | Richland Parish Power Station 3 | Gas, combined cycle | 780.3 MW | 2.6 km away | nearest: Centenial Pipeline |
| Postponed | Sugar Creek Power | Gas, combined cycle | 508.7 MW | 3.9 km away | nearest: Robinson - Lima |
| Studied | Richland Parish Power Station 1&2 | Gas, other | 1,640 MW | 5.8 km away | nearest: Centenial Pipeline |
| Studied | Franklin Farms 1&2 | Gas, other | 1,640 MW | 6.0 km away | nearest: Centenial Pipeline |
| Filed | Delta Blues Advanced Power Station | Gas, combined cycle | 818.7 MW | 9.9 km away | nearest: Centenial Pipeline |
| Postponed | ESC Brooke County Power I | Gas, combined cycle | 841.5 MW | 10.6 km away | nearest: Toledo - Steubenville |
| Under construction | Orange County Advanced Power Station | Gas, combined cycle | 1,306 MW | 13.9 km away | nearest: Centenial Pipeline |
| Postponed | St Joseph Energy Center | Gas, combined cycle | 1,406 MW | 13.9 km away | nearest: Wabash 12in Product |
| Studied | Legend Power Station | Gas, other | 820 MW | 14.0 km away | nearest: Centenial Pipeline |
| Postponed | Gibson County Generation Station | Gas, combined cycle | 432 MW | 14.0 km away | nearest: Centenial Pipeline |
| Under construction | Mill Creek (KY) | Gas, combined cycle | 740 MW | 14.5 km away | nearest: Robinson - Louisville - Lexington |
| Postponed | Batesville Generation Facility | Gas, combined cycle | 292 MW | 16.7 km away | nearest: Centenial Pipeline |
| Postponed | Harrod Electric Generating Station | Gas, combustion turbine | 564 MW | 18.9 km away | nearest: Robinson - Lima |
| Postponed | Amelia Energy Center | Gas, combined cycle | 900 MW | 20.4 km away | nearest: Centenial Pipeline |
| Postponed | Fairmount Electric Generating | Gas, combustion turbine | 471.2 MW | 20.5 km away | nearest: Robinson - Lima |
| Permitted | Crawfordsville Power Plant | Gas, combined cycle | 16.3 MW | 21.4 km away | nearest: Wood River - Clermont |
Sources EIA-860M · Berkeley Lab
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.