Laredo Bus Facility Solar Canopies — Power plant · Solar · MARTADATA CENTER ATLANTA, LLC — Large load · GA · 11.1 km awayQUALITY INVESTMENT PROPERTIES METRO, LLC — Large load · GA · 14.1 km awayDeKalb County Green Energy Facility — Biomass · GA · 1.6 MW · 14.3 km awayTA Reality Ellenwood Data Center — Large load · GA · 16.3 km awayLeibherr LR 1400 (Atlanta data centre) — Large load · GA · 17.6 km awayFT GIllem MASE Crane (Forest Park data centre) — Large load · GA · 18.1 km awayTRAVELERS DATA CENTER — Large load · GA · 20.6 km awayDCB ATLANTA EAST, LLC — Large load · GA · 22.8 km away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Cooperative

As filed: MARTA

Key facts

Cooperative · 1 MW
Assets
1
States
GA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,118 of 50,271 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2012 to 2024
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearSolarTotal (MWh)
202400
202300
2022117117
2021234234
20201,7621,762
20191,8661,866
20181,2881,288
2017925925
2016963963
20151,3671,367
20141,4491,449
20131,3581,358
20121,3191,319

Sources EIA-860 · EIA-860M · EIA

Sources

Attribution

Assets 1

Assets

1

Capacity

1.0 MW

MW by fuel
  1. Solar: 1.0 MW, 1 asset

Operates 1 power plant

Sources EIA-860M · GEM

Sources

Every source and license · Attribution

Around this company

Nearby 8

within 25 km

Projects

8

within 25 km

Nearest

11.1 km

DATA CENTER ATLANTA, LLC

All 8NearbyShowing all 8 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Built DATA CENTER ATLANTA, LLC Large load — 11.1 km away nearest: Laredo Bus Facility Solar Canopies
Built QUALITY INVESTMENT PROPERTIES METRO, LLC Large load — 14.1 km away nearest: Laredo Bus Facility Solar Canopies
Postponed DeKalb County Green Energy Facility Biomass 1.6 MW 14.3 km away nearest: Laredo Bus Facility Solar Canopies
Filed TA Reality Ellenwood Data Center Large load — 16.3 km away nearest: Laredo Bus Facility Solar Canopies
Filed Leibherr LR 1400 (Atlanta data centre) Large load — 17.6 km away nearest: Laredo Bus Facility Solar Canopies
Filed FT GIllem MASE Crane (Forest Park data centre) Large load — 18.1 km away nearest: Laredo Bus Facility Solar Canopies
Built TRAVELERS DATA CENTER Large load — 20.6 km away nearest: Laredo Bus Facility Solar Canopies
Built DCB ATLANTA EAST, LLC Large load — 22.8 km away nearest: Laredo Bus Facility Solar Canopies