Tri Center Naniwa Energy — Power plant · Gas, combustion turbine · Naniwa Energy LLCBerkelcentrale power station — Power plant · Gas, combined cycle · Berkelcentrale BeheerMORGAN STANLEY DATA CENTER — Built · Built · Large load · NJPeru Ridge - Data Center Building 1 — Filed · Large load · NV · 1.9 mi awayBZI Crane (BTS 107) (Sparks data centre) — Filed · Large load · NV · 2.7 mi awayMaxim Crane 6257 Edgecore RN01 Sparks — Filed · Large load · NV · 3.0 mi awayTesla Reno GigaFactory — Under construction · Solar · NV · 1 MW · 4.4 mi awayTesla Reno GigaFactory — Postponed · Solar · NV · 10.4 MW · 4.4 mi awayLeemslagen solar farm -- — Under construction · Solar · Netherlands · 20 MW · 24.2 km away
  • Combustion
  • Loads
  • Operating
  • Retired
  • Size not stated
  • Approximate location
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Power plant owner

As filed: MORGAN STANLEY

Key facts

Power plant ownerNo parent recordedLike 48,147 of 50,300 companies here. Why
Headquarters
New York City, United States Source: Wikidata
Listed
NYSE: MS Source: SEC EDGAR
LEI
IGJSJL3JD5P30I6NJZ34 Source: Wikidata

On the map, by stage

Load demand — MW operating (1 load)

Gross output of plants with a stake

1 of 2 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 2 plants with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2001 to 2017
  • Gas
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearGasTotal (MWh)
2017 (part year)00
201600
201500
201400
201300
201200
201100
201000
200900
2008821821
200746,91846,918
200640,31740,317
200524,22024,220
20047,9497,949
200341,02541,025
200250,05150,051
2001 (part year)105,069105,069

Sources GEM · EIA-860M · EIA · EPA GHGRP

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 27, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EPA GHGRPOpen license · retrieved Nov 2, 2026

Attribution

Sources 4

Registers

4

Reuse terms

  • 3 Open license
  • 1 Open license, with credit

Latest read

2026-11-16

From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.

Sources

  • GEM ·

    Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

    Open license, with credit · retrieved Oct 26, 2026

    Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license

    In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • EPA ICIS-Air ·

    EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)

    Open license · retrieved Nov 16, 2026

    US federal work — public domain, 17 U.S.C. §105 (docs/13 §2.12 EPA hedge applies)

    View at source →
  • Wikidata ·

    Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)

    Open license · retrieved Nov 4, 2026

    Source: Wikidata (CC0) · license

    Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • SEC EDGAR ·

    SEC EDGAR company tickers with exchange (company_tickers_exchange.json — CIK, EDGAR conformed name, ticker, exchange)

    Open license · retrieved Nov 4, 2026

    Source: U.S. Securities and Exchange Commission, EDGAR · license

    SEC website, "Privacy and Information Security" (https://www.sec.gov/about/privacy-information, read 2026-10-22), Website Dissemination: "Information presented on sec.gov is considered public information and may be copied or further distributed by users of the web site without the SEC’s permission. Please consider appropriate citation to the SEC as the source." SEC "Accessing EDGAR Data" (https://www.sec.gov/search-filings/edgar-search-assistance/accessing-edgar-data, read 2026-10-22): "Current max request rate: 10 requests/second."; "Please declare your user agent in request headers: Sample Declared Bot Request Headers: User-Agent: Sample Company Name AdminContact@<sample company domain>.com"; on this file: "We periodically update these files to provide functionality for EDGAR searches, but do not guarantee accuracy or scope." A compilation by a federal agency (17 U.S.C. §105).

    Summary only: the source’s license keeps the full record at the source.

    View at source →

Around this company

Nearby 6

within 15 mi (25 km outside the US)

Projects

6

within 15 mi (25 km outside the US)

Nearest

1.9 mi

Peru Ridge - Data Center Building 1

All 6NearbyShowing all 6 nearby projects. They fill 5 rows, as a project's generator units share a row.

How these are matched

Exact-grade projects within 15 mi (25 km outside the US) of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi (25 km outside the US) of this company’s assets, sorted by distance, nearest first: 5 rows for the nearest of 6.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Filed Peru Ridge - Data Center Building 1 Large load — 1.9 mi away nearest: Tri Center Naniwa Energy
Filed BZI Crane (BTS 107) (Sparks data centre) Large load — 2.7 mi away nearest: Tri Center Naniwa Energy
Filed Maxim Crane 6257 Edgecore RN01 Sparks Large load — 3.0 mi away nearest: Tri Center Naniwa Energy
Under construction Tesla Reno GigaFactory × 2 units Solar 11.4 MW 4.4 mi away nearest: Tri Center Naniwa Energy
Under construction Leemslagen solar farm -- Solar 20 MW 24.2 km away nearest: Berkelcentrale power station

Sources FAA OE/AAA · EIA-860M · GEM

Sources

  • FAA OE/AAAOpen license · retrieved Nov 23, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution