Show on map
- Wind & solar
- Loads
- In development
- Under construction
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Loads
- In development
- Under construction
- Size not stated
Maxim Crane 6257 Edgecore RN01 Sparks: the source's site coordinate and 9 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Maxim Crane 6257 Edgecore RN01 Sparks
Data center
- Kind
- Data center
- Location
- Storey County, Nevada
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Data center source: “Data Center”
- Capacity (MW)
- Not stated
Local approvals PremiumComing soon: moratoriums, zoning votes and hearings for a site's county and city. Join for early access.
Timeline
- Observed as filed in FAA OE/AAA (source status: “Determined - No Hazard”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources FAA OE/AAA
Local government activity · LocalGovIndex Meeting records by GovData Systems
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| BZI Crane (BTS 107) (Sparks data centre) Filed | Large load | 0.7 mi | |
| Peru Ridge - Data Center Building 1 Filed | Large load | 1.1 mi | |
| Tesla Reno GigaFactory Under construction | Solar | 2.5 mi | 1 |
| Tesla Reno GigaFactory Postponed | Solar | 2.5 mi | 10.4 |
| Building A (Silver Springs data centre) Filed | Large load | 12.2 mi | |
| OTM-J Data Center Building J Filed | Large load | 12.7 mi | |
| OTM-R Data Center Building R Filed | Large load | 13.0 mi | |
| Building K (Silver Springs data centre) Filed | Large load | 13.2 mi | |
| OTM-D Data Center Building D Filed | Large load | 13.6 mi |
Sources FAA OE/AAA · EIA-860M