Show on map
Peru Ridge - Data Center Building 1BZI Crane (BTS 107) (Sparks data centre) — Filed · Large load · NV · 0.8 mi awayMaxim Crane 6257 Edgecore RN01 Sparks — Filed · Large load · NV · 1.1 mi awayTesla Reno GigaFactory — Under construction · Solar · NV · 1 MW · 3.1 mi awayTesla Reno GigaFactory — Postponed · Solar · NV · 10.4 MW · 3.1 mi awayBuilding A (Silver Springs data centre) — Filed · Large load · NV · 13.3 mi awayOTM-J Data Center Building J — Filed · Large load · NV · 13.8 mi awayOTM-R Data Center Building R — Filed · Large load · NV · 14.1 mi awayBuilding K (Silver Springs data centre) — Filed · Large load · NV · 14.2 mi awayOTM-D Data Center Building D — Filed · Large load · NV · 14.6 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Size not stated
  • 10 · 100 · 1,000 MW

Peru Ridge - Data Center Building 1

Data center

Kind
Data center
Location
Storey County, Nevada

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Data center source: “Data Center”
Capacity (MW)
Not stated
Local approvals PremiumComing soon: moratoriums, zoning votes and hearings for a site's county and city. Join for early access.

Timeline

  • Observed as filed in FAA OE/AAA (source status: “Determined - No Hazard”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources FAA OE/AAA

Sources

  • FAA OE/AAAOpen license · retrieved Nov 16, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
BZI Crane (BTS 107) (Sparks data centre) Filed Large load 0.8 mi
Maxim Crane 6257 Edgecore RN01 Sparks Filed Large load 1.1 mi
Tesla Reno GigaFactory Under construction Solar 3.1 mi 1
Tesla Reno GigaFactory Postponed Solar 3.1 mi 10.4
Building A (Silver Springs data centre) Filed Large load 13.3 mi
OTM-J Data Center Building J Filed Large load 13.8 mi
OTM-R Data Center Building R Filed Large load 14.1 mi
Building K (Silver Springs data centre) Filed Large load 14.2 mi
OTM-D Data Center Building D Filed Large load 14.6 mi

Sources FAA OE/AAA · EIA-860M

Sources

  • FAA OE/AAAOpen license · retrieved Nov 16, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution