- Wind & solar
- Operating
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Operating
- Other companies nearby
32 assets
32 assets. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
5 outside this view, drawn where they are: zoom out to see them.
Naturgy Energy Group
Power plant owner
Key facts
Power plant owner · 1,740.2 MW- Capacity held
- 1,740.2MW
- Assets
- 32
- Headquarters
- Madrid, Spain Source: Wikidata
- Website
- naturgy.com Source: Wikidata
- Listed
- OTC Markets Group: GASNF Source: Wikidata
- LEI
- TL2N6M87CW970S5SV098 Source: Wikidata
- Wikipedia
- English article Source: Wikidata
- Parent
- No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why
Assets 32
Assets
32
Capacity
1,740 MW
- Wind: 1,120 MW, 23 assets
- Solar: 620 MW, 9 assets
Operates 32 power plants
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Sources 2
Registers
2
Reuse terms
- 1 Open license
- 1 Open license, with credit
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 26
within 25 kmProjects
26
within 25 km
Nearest
2.9 km
Patiñeiro wind farm --
All 26NearbyShowing all 26 nearby projects.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Announced | Patiñeiro wind farm -- | Wind | 17.8 MW | 2.9 km away | nearest: Monte Tourado-Eixe wind farm |
| Announced | San Lorenzo D solar farm -- | Solar | 34.4 MW | 3.1 km away | nearest: Torozos wind farm |
| Announced | Peña Nebina Hybrid solar farm -- | Solar | 20.5 MW | 3.4 km away | nearest: El Hierro wind farm |
| Announced | Cierzo II solar farm -- | Solar | 46.9 MW | 3.5 km away | nearest: Tirupan wind farm |
| Under construction | Bluesol solar farm 1 | Solar | 27.8 MW | 4.4 km away | nearest: La Nava solar farm |
| Under construction | Bluesol solar farm 2 | Solar | 27.8 MW | 4.4 km away | nearest: La Nava solar farm |
| Announced | Montaña Blanca I solar farm -- | Solar | 27.8 MW | 4.9 km away | nearest: La Nava solar farm |
| Announced | Satrebares wind farm -- | Wind | 125 MW | 5.6 km away | nearest: Cordal De Montouto wind farm |
| Announced | Malvasía wind farm -- | Wind | 16.8 MW | 6.2 km away | nearest: El Hierro wind farm |
| Announced | Marchenilla VIII solar farm -- | Solar | 25 MW | 6.9 km away | nearest: El Tesorillo wind farm |
| Announced | Marchenilla solar farm -- | Solar | 44 MW | 7.0 km away | nearest: El Tesorillo wind farm |
| Announced | Cierzo IV solar farm -- | Solar | 47.7 MW | 7.5 km away | nearest: Tirupan wind farm |
| Announced | Batifol wind farm -- | Wind | 12.5 MW | 8.6 km away | nearest: Monciro wind farm |
| Announced | Pinot wind farm -- | Wind | 16.8 MW | 9.6 km away | nearest: El Hierro wind farm |
| Under construction | Granja Sedena wind farm -- | Wind | 15 MW | 9.8 km away | nearest: Bii Hioxo wind farm |
| Announced | Tudela II solar farm -- | Solar | 23.9 MW | 14.4 km away | nearest: Tirupan wind farm |
| Announced | Meco solar farm -- | Solar | 50 MW | 15.1 km away | nearest: Canredondo solar farm |
| Announced | Muracais wind farm -- | Wind | 52.8 MW | 16.3 km away | nearest: Monciro wind farm |
| Announced | Seixo wind farm -- | Wind | 77 MW | 16.7 km away | nearest: Pastoriza-Rodeiro wind farm |
| Announced | Montelora wind farm -- | Wind | 27.6 MW | 18.5 km away | nearest: Serra Do Punago-Vacariza wind farm |
| Announced | Morata (Matrix) solar farm -- | Solar | 60 MW | 19.1 km away | nearest: Ocaña solar farm |
| Announced | Zamora 3 solar farm -- | Solar | 29 MW | 19.7 km away | nearest: El Hierro wind farm |
| Canceled | Los Barrios power station Unit 2 | Coal | 800 MW | 21.1 km away | nearest: El Tesorillo wind farm |
| Announced | Serra de Liñares wind farm -- | Wind | 50.4 MW | 22.8 km away | nearest: Monciro wind farm |
| Announced | Arno wind farm -- | Wind | 86.8 MW | 23.4 km away | nearest: Monciro wind farm |
| Canceled | Sayago nuclear power plant 1 | Nuclear | 1,075 MW | 24.4 km away | nearest: El Hierro wind farm |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.