90 assets · 3 projects
90 assets · 3 projects. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Not on this map: 22 projects: placed by county or state, a license that withholds the site, or a stage the map draws no dot for (withdrawn, canceled, frozen or not stated). Each is in its tab below.
15 outside this view, drawn where they are: zoom out to see them.
Power plant owner
- Capacity held
- 14,854.2MW
- Assets
- 90
- Companies below
- 1
- Registered in
- United States
Projects 25
Capacity
2.74 GW
2.01 GW active
- Announced: 1.55 GW, 14 projects
- In process: 0.46 GW, 6 projects
- Withdrawn or canceled: 0.70 GW, 4 projects
- Status unknown: 0.03 GW, 1 project
Including subsidiaries
Sources GEM
Assets 90
Assets
90
Capacity
14,854 MW
- Gas, combined cycle: 9,292 MW, 13 assets
- Wind: 2,427 MW, 54 assets
- Coal: 1,830 MW, 3 assets
- Solar: 1,057 MW, 17 assets
- Gas, reciprocating engine: 194 MW, 2 assets
- Storage: 54.0 MW, 1 asset
Owns 90 power plants
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Ownership 2
Companies
2
this one included
Parents
0
Subsidiaries
1
direct
Holding assets
2
of 2 companies in the group
-
Naturgy Energy Group SA This company 87 assets13,024.2 MWwith the companies below
-
Naturgy México SA de CV Subsidiary · share not stated 4 assets2,364 MW
-
The same companies as a table, with each ownership claim
| Company. Sort by company, A to Z | Relationship, sorted ascending. Sort by relationship, subsidiaries first | Assets. Sort by assets held, largest first | Asset types |
|---|---|---|---|
| Naturgy Energy Group SA | This company | 86 | power plant |
| Naturgy México SA de CV | Subsidiary | 4 | power plant |
Sources 1
Registers
1
Reuse terms
- 1 Open license, with credit
Latest read
2026-10-26
From its recordsSourcesThe registers behind this company's assets, projects and RFPs; the company record itself is derived from them.
Sources
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 118
within 25 kmProjects
118
within 25 km
Nearest
1.4 km
Jambolán solar farm --
All 118NearbyShowing all 118 nearby projects. The 50 nearest are listed.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Announced | Jambolán solar farm -- | Solar | 18.4 MW | 1.4 km away | nearest: Palamara power station |
| Canceled | Graviola Solar Plant 1 | Solar | 75 MW | 1.6 km away | nearest: Sobral 1 (Piauí) solar farm |
| Canceled | Graviola Solar Plant 3 | Solar | 75 MW | 2.8 km away | nearest: Sobral 1 (Piauí) solar farm |
| Announced | Sobral 2 (Piauí) solar farm -- | Solar | 30 MW | 2.9 km away | nearest: Sobral 1 (Piauí) solar farm |
| Announced | Patiñeiro wind farm -- | Wind | 17.8 MW | 2.9 km away | nearest: Monte Tourado-Eixe wind farm |
| Announced | San Lorenzo D solar farm -- | Solar | 34.4 MW | 3.1 km away | nearest: Torozos wind farm |
| Canceled | Graviola Solar Plant 2 | Solar | 75 MW | 3.2 km away | nearest: Sobral 1 (Piauí) solar farm |
| Announced | Peña Nebina Hybrid solar farm -- | Solar | 20.5 MW | 3.4 km away | nearest: El Hierro wind farm |
| Announced | Cierzo II solar farm -- | Solar | 46.9 MW | 3.5 km away | nearest: Tirupan wind farm |
| Under construction | Tabernas 3 solar farm -- | Solar | 32.9 MW | 3.8 km away | nearest: Tabernas (Naturgy) solar farm |
| Canceled | Los Morales wind farm -- | Wind | 31.5 MW | 4.2 km away | nearest: La Rabia wind farm |
| Announced | Palmeira solar farm 5 | Solar | 30 MW | 4.2 km away | nearest: Sobral 1 (Piauí) solar farm |
| Under construction | Bluesol solar farm 1 | Solar | 27.8 MW | 4.4 km away | nearest: La Nava solar farm |
| Under construction | Bluesol solar farm 2 | Solar | 27.8 MW | 4.4 km away | nearest: La Nava solar farm |
| Announced | Montaña Blanca I solar farm -- | Solar | 27.8 MW | 4.9 km away | nearest: La Nava solar farm |
| Canceled | Graviola Solar Plant 4 | Solar | 75 MW | 5.3 km away | nearest: Sobral 1 (Piauí) solar farm |
| Announced | Seixo wind farm -- | Wind | 77 MW | 5.3 km away | nearest: Meirama power station |
| Announced | Vilamalafronser wind farm -- | Wind | 75.9 MW | 5.4 km away | nearest: A Pastoriza wind farm |
| Announced | Satrebares wind farm -- | Wind | 125 MW | 5.6 km away | nearest: Cordal De Montouto wind farm |
| Announced | Malvasía wind farm -- | Wind | 16.8 MW | 6.2 km away | nearest: El Hierro wind farm |
| Announced | Palmeira solar farm 6 | Solar | 30 MW | 6.3 km away | nearest: Sobral 1 (Piauí) solar farm |
| Announced | Sierra de Zalama wind farm -- | Wind | 22.4 MW | 6.3 km away | nearest: La Sía wind farm |
| Announced | Briesa wind farm -- | Wind | 90 MW | 6.8 km away | nearest: Montija wind farm |
| Announced | Marchenilla VIII solar farm -- | Solar | 25 MW | 6.9 km away | nearest: El Tesorillo wind farm |
| Announced | Marchenilla solar farm -- | Solar | 44 MW | 7.0 km away | nearest: El Tesorillo wind farm |
| Announced | Penas Pardas wind farm -- | Wind | 29 MW | 7.0 km away | nearest: Alto Do Seixal wind farm (Spain) |
| Announced | Puerto Sostenible I solar farm -- | Solar | 43.5 MW | 7.3 km away | nearest: Palos power station |
| Announced | Puerto Sostenible II solar farm -- | Solar | 43.5 MW | 7.3 km away | nearest: Palos power station |
| Announced | Cierzo IV solar farm -- | Solar | 47.7 MW | 7.5 km away | nearest: Tirupan wind farm |
| Announced | Batifol wind farm -- | Wind | 12.5 MW | 8.6 km away | nearest: Monciro wind farm |
| Announced | Pinot wind farm -- | Wind | 16.8 MW | 9.6 km away | nearest: El Hierro wind farm |
| Under construction | Granja Sedena wind farm -- | Wind | 15 MW | 9.8 km away | nearest: Bii Hioxo wind farm |
| Announced | Palmeira solar farm 4 | Solar | 30 MW | 9.8 km away | nearest: Sobral 1 (Piauí) solar farm |
| Under construction | San Miguel D solar farm -- | Solar | 39.7 MW | 9.9 km away | nearest: San Agustín wind farm |
| Announced | Palmeira solar farm 3 | Solar | 30 MW | 11.0 km away | nearest: Sobral 1 (Piauí) solar farm |
| Under construction | Golden Plains wind farm (Australia) West | Wind | 574 MW | 11.3 km away | nearest: Berrybank wind farm |
| Announced | Zamora 3 solar farm -- | Solar | 29 MW | 11.9 km away | nearest: Montamarta wind farm |
| Under construction | El Bonete solar farm -- | Solar | 38.5 MW | 12.0 km away | nearest: San Agustín wind farm |
| Announced | Arno wind farm -- | Wind | 86.8 MW | 12.6 km away | nearest: A Pastoriza wind farm |
| Announced | El Tronco wind farm -- | Wind | 15 MW | 13.5 km away | nearest: A Pastoriza wind farm |
| Canceled | Trillo nuclear power plant 2 | Nuclear | 1,000 MW | 13.7 km away | nearest: Canredondo wind farm |
| Announced | Bustatur wind farm -- | Wind | 41.6 MW | 14.0 km away | nearest: Montejo De Bricia wind farm |
| Announced | Tudela II solar farm -- | Solar | 23.9 MW | 14.4 km away | nearest: Tirupan wind farm |
| Canceled | Río Haina power station Unit 5 | Coal | 120 MW | 14.6 km away | nearest: Palamara power station |
| Canceled | Río Haina power station Unit 6 | Coal | 120 MW | 14.6 km away | nearest: Palamara power station |
| Announced | Meco solar farm -- | Solar | 50 MW | 15.1 km away | nearest: Canredondo solar farm |
| Announced | Figueiras wind farm -- | Wind | 22.5 MW | 15.4 km away | nearest: Alto Do Seixal wind farm (Spain) |
| Announced | Palmeira solar farm 1 | Solar | 30 MW | 15.5 km away | nearest: Sertão solar farm |
| Announced | Palmeira solar farm 2 | Solar | 30 MW | 15.6 km away | nearest: Sobral 1 (Piauí) solar farm |
| Announced | Muracais wind farm -- | Wind | 52.8 MW | 16.3 km away | nearest: Monciro wind farm |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.