Kline Township Cogen Facility — Power plant · Coal · Northeastern Power CoBroad Mountain Wind Project — Postponed · Wind · PA · 80 MW · 4.9 mi awayPF Onsite BESS — Filed · Storage · PA · 21 MW · 5.5 mi awayData Center — Filed · Large load · PA · 7.1 mi awayPA Solar Park — Postponed · Solar · PA · 9.9 MW · 7.4 mi away
  • Combustion
  • Retired
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Northeastern Power Co

Follow this company

Power plant owner

Key facts

Power plant owner · 59 MW
Assets
1
States
PA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Assets 1

Assets

1

Capacity

59.0 MW

MW by fuel
  1. Coal: 59.0 MW, 1 asset

Operates 1 power plant

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 4

within 15 mi

Projects

4

within 15 mi

Nearest

4.9 mi

Broad Mountain Wind Project

All 4NearbyShowing all 4 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Broad Mountain Wind Project Wind 80 MW 4.9 mi away nearest: Kline Township Cogen Facility
Filed PF Onsite BESS Storage 21 MW 5.5 mi away nearest: Kline Township Cogen Facility
Filed Data Center Large load — 7.1 mi away nearest: Kline Township Cogen Facility
Postponed PA Solar Park Solar 9.9 MW 7.4 mi away nearest: Kline Township Cogen Facility

Sources EIA-860M · FAA OE/AAA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 13, 2026

Every source and license · Attribution