Oasis Pipeline — Gas pipeline · Oasis PipelineCoyanosa Gas — Under construction · Gas, reciprocating engine · TX · 10 MW · 0.3 mi awaySealy Power Peaking Facility — Postponed · Gas, combustion turbine · TX · 200 MW · 0.9 mi awayGuadalupe Generating Station — Postponed · Gas, combustion turbine · TX · 320 MW · 2.4 mi awayCPV Basin Ranch Energy Center — Under construction · Gas, combined cycle · TX · 1,350 MW · 3.8 mi awayClear Springs Energy Center — Postponed · Gas, combustion turbine · TX · 549 MW · 4.1 mi awayStaghorn Gas — Under construction · Gas, reciprocating engine · TX · 9.9 MW · 4.2 mi awayVast Sands Power — Under construction · Gas, combustion turbine · TX · 880 MW · 6.8 mi away
  • Other infrastructure
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Oasis Pipeline

Follow this company

Gas pipeline operator

Key facts

Gas pipeline operator · 861 miles
Pipeline and line held
861miles
Assets
1
States
TX
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Assets 1

Assets

1

Assets by type
  1. Gas pipeline: 1 assets, 1 asset

Operates 1 gas pipeline

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z Miles. Sort by length, largest first State. Sort by state, A to Z Held by
Oasis Pipeline Gas pipeline Operates 861 miles US-TX Oasis Pipeline

Sources EIA Energy Atlas

Sources

Every source and license · Attribution

Around this company

Nearby 7

within 15 mi

Projects

7

of 33 before the technology filter

Nearest

0.3 mi

Coyanosa Gas

7 of 33 · gas-related technologiesNearbyShowing 7 of 33 nearby projects, narrowed to gas-related technologies because this company operates gas infrastructure. Show all 33

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Under construction Coyanosa Gas Gas, reciprocating engine 10 MW 0.3 mi away nearest: Oasis Pipeline
Postponed Sealy Power Peaking Facility Gas, combustion turbine 200 MW 0.9 mi away nearest: Oasis Pipeline
Postponed Guadalupe Generating Station Gas, combustion turbine 320 MW 2.4 mi away nearest: Oasis Pipeline
Under construction CPV Basin Ranch Energy Center Gas, combined cycle 1,350 MW 3.8 mi away nearest: Oasis Pipeline
Postponed Clear Springs Energy Center Gas, combustion turbine 549 MW 4.1 mi away nearest: Oasis Pipeline
Under construction Staghorn Gas Gas, reciprocating engine 9.9 MW 4.2 mi away nearest: Oasis Pipeline
Under construction Vast Sands Power Gas, combustion turbine 880 MW 6.8 mi away nearest: Oasis Pipeline

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Every source and license · Attribution