SARATOGA RP EAST LLC, TPSL COLUMBUS — Petroleum product terminalSARATOGA RP EAST LLC, ALBANY — Petroleum product terminalH Allen Franklin Combined Cycle — Postponed · Gas, combined cycle · AL · 688.1 MW · 12.7 mi awayTalbot County Energy — Announced · Gas, combustion turbine · GA · 262 MW · 13.3 mi away
  • Other infrastructure
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Saratoga RP East LLC

Follow this company

Petroleum product terminal owner

As filed: SARATOGA RP EAST LLC

Key facts

Petroleum product terminal owner · 0 projects
Projects
0projects
Assets
2
States
GA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Assets 2

Assets

2

Assets by type
  1. Petroleum product terminal: 2 assets, 2 assets

Owns 2 petroleum product terminals

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z State. Sort by state, A to Z Held by
SARATOGA RP EAST LLC, TPSL COLUMBUS Petroleum product terminal Owns US-GA SARATOGA RP EAST LLC
SARATOGA RP EAST LLC, ALBANY Petroleum product terminal Owns US-GA SARATOGA RP EAST LLC

Sources EIA Energy Atlas

Sources

  • EIA Energy AtlasOpen license · retrieved Nov 13, 2026Source: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Terminals (as of September 2021)

Every source and license · Attribution

Around this company

Nearby 2

within 15 mi

Projects

2

of 5 before the technology filter

Nearest

12.7 mi

H Allen Franklin Combined Cycle

2 of 5 · gas, oil and hydrogen technologiesNearbyShowing 2 of 5 nearby projects, narrowed to gas, oil and hydrogen technologies because this company operates oil or liquids infrastructure. Show all 5

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed H Allen Franklin Combined Cycle Gas, combined cycle 688.1 MW 12.7 mi away nearest: SARATOGA RP EAST LLC, TPSL COLUMBUS
Announced Talbot County Energy Gas, combustion turbine 262 MW 13.3 mi away nearest: SARATOGA RP EAST LLC, TPSL COLUMBUS

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution