Bengal Pipeline — Petroleum product pipeline · SHELL MIDSTREAM PARTNERSGeismar — Gas, combustion turbine · LA · 70 MW · 3.0 km awayWaterford 5 — Gas, other · LA · 478 MW · 7.3 km awayWaterford 6 — Gas, combined cycle · LA · 820 MW · 7.3 km awayPointe Coupee Power Station — Gas, combined cycle · LA · 2,340.9 MW · 10.5 km away
  • Other infrastructure
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Shell Midstream Partners

Follow this company

Petroleum product pipeline operator

As filed: SHELL MIDSTREAM PARTNERS

Key facts

Petroleum product pipeline operator · 137 miles
Pipeline and line held
137miles
Assets
1
States
LA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,118 of 50,271 companies here. Why

Assets 1

Assets

1

Assets by type
  1. Petroleum product pipeline: 1 assets, 1 asset

Operates 1 petroleum product pipeline

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z Miles. Sort by length, largest first State. Sort by state, A to Z Held by
Bengal Pipeline Petroleum product pipeline Operates 137 miles US-LA SHELL MIDSTREAM PARTNERS

Sources EIA Energy Atlas

Sources

Every source and license · Attribution

Around this company

Nearby 4

within 25 km

Projects

4

of 7 before the technology filter

Nearest

3.0 km

Geismar

4 of 7 · gas, oil and hydrogen technologiesNearbyShowing 4 of 7 nearby projects, narrowed to gas, oil and hydrogen technologies because this company operates oil or liquids infrastructure. Show all 7

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Geismar Gas, combustion turbine 70 MW 3.0 km away nearest: Bengal Pipeline
Permitted Waterford 5 Gas, other 478 MW 7.3 km away nearest: Bengal Pipeline
Announced Waterford 6 Gas, combined cycle 820 MW 7.3 km away nearest: Bengal Pipeline
Announced Pointe Coupee Power Station Gas, combined cycle 2,340.9 MW 10.5 km away nearest: Bengal Pipeline

Sources EIA-860M · Berkeley Lab

Sources

  • EIA-860M Preliminary Monthly Electric Generator InventoryOpen license · retrieved 4 Nov 2026
  • LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)Open license, with credit · retrieved 4 Nov 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.

Every source and license · Attribution