- Combustion
- Wind & solar
- In development
- Operating
- Retired
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- In development
- Operating
- Retired
- Other companies nearby
23 assets · 2 projects
23 assets · 2 projects. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Not on this map: 6 projects: placed by county or state, a license that withholds the site, or a stage the map draws no dot for (withdrawn, canceled, frozen or not stated). Each is in its tab below.
TAURON Polska Energia SA
Power plant owner
Key facts
Power plant owner · 5,395 MW- Capacity held
- 5,395MW
- Assets
- 23
- Projects
- 8
- Companies below
- 2
- Registered in
- United States
- Parent
- No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why
Projects 8
Capacity
3.15 GW
0.90 GW active
Including subsidiaries
Sources GEM
Assets 23
Assets
23
Capacity
5,395 MW
- Coal: 4,826 MW, 9 assets
- Wind: 532 MW, 13 assets
- Solar: 37.0 MW, 1 asset
Owns 23 power plants
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Ownership 3
Companies
3
this one included
Parents
0
Subsidiaries
2
direct
Holding assets
3
of 3 companies in the group
-
TAURON Polska Energia SA This company 21 assets5,030 MWwith the companies below
-
TAURON Cieplo SP zoo Subsidiary · share not stated 3 assets345 MW
-
TAURON Wytwarzanie SA Subsidiary · share not stated 6 assets4,258 MW
-
The same companies as a table, with each ownership claim
| Company. Sort by company, A to Z | Relationship, sorted ascending. Sort by relationship, subsidiaries first | Assets. Sort by assets held, largest first | Asset types |
|---|---|---|---|
| TAURON Polska Energia SA | This company | 13 | power plant |
| TAURON Wytwarzanie SA | Subsidiary | 8 | power plant |
| TAURON Cieplo SP zoo | Subsidiary | 3 | power plant |
Sources 1
Registers
1
Reuse terms
- 1 Open license, with credit
Latest read
2026-10-26
From its recordsSourcesThe registers behind this company's assets, projects and RFPs; the company record itself is derived from them.
Sources
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 14
within 25 kmProjects
14
within 25 km
Nearest
0.0 km
Mysłowice solar farm 2
All 14NearbyShowing all 14 nearby projects.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Announced | Mysłowice solar farm 2 | Solar | 60 MW | 0.0 km away | nearest: Mysłowice solar farm |
| Announced | Lagisza power station CC9 | Gas, combined cycle | 100 MW | 0.0 km away | nearest: Lagisza power station |
| Canceled | Siersza power station Unit 7 | Coal | 900 MW | 0.1 km away | nearest: Siersza power station |
| Announced | Pomorzany power station IC 1 | Gas, reciprocating engine | 24 MW | 7.7 km away | nearest: Mierzyn wind farm |
| Announced | Zabrze power station Phase II, timepoint 2 | Biomass | 76.5 MW | 8.0 km away | nearest: Halemba power station |
| Announced | Ramin 1 solar farm -- | Solar | 20 MW | 9.1 km away | nearest: Mierzyn wind farm |
| Announced | Zwartowo solar farm 2 | Solar | 86 MW | 10.9 km away | nearest: Wicko (TAURON) wind farm |
| Announced | LoecknitzFrei2 solar project -- | Solar | 1.7 MW | 16.7 km away | nearest: Mierzyn wind farm |
| Announced | PVA Bergholz solar farm -- | Solar | 60.2 MW | 17.4 km away | nearest: Mierzyn wind farm |
| Announced | PS1 Petersruh Solar 1 solar farm -- | Solar | 1.5 MW | 20.7 km away | nearest: Mierzyn wind farm |
| Announced | BSPV Brüssower See PV solar project -- | Solar | 3 MW | 21.4 km away | nearest: Mierzyn wind farm |
| Canceled | Rybnik power station Unit 9 | Coal | 910 MW | 23.0 km away | nearest: Laziska power station |
| Under construction | Rybnik power station CC1 | Gas, combined cycle | 900 MW | 23.0 km away | nearest: Laziska power station |
| Announced | Rybnik power station Rybnik II | Gas, combustion turbine | 600 MW | 23.0 km away | nearest: Laziska power station |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.