Tenaris Dalmine power station — Power plant · Gas, combined cycleArgener power station — Power plant · Gas, combustion turbineBuena Ventura wind farm — Power plant · WindCassano D'Adda power station CCTG8 — Announced · Gas, combined cycle · Italy · 920 MW · 16.0 km away
  • Combustion
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Tenaris SA

Follow this company

Power plant owner

Key facts

Power plant owner · 388 MW
Assets
3
Companies below
2
Registered in
Italy
Parent
No parent recordedNo parent recordedLike 48,120 of 50,273 companies here. Why

Assets 3

Assets

3

Capacity

388 MW

MW by fuel
  1. Gas, combustion turbine: 163 MW, 1 asset
  2. Gas, combined cycle: 122 MW, 1 asset
  3. Wind: 103 MW, 1 asset

Owns 3 power plants

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Share Held by
Argener power station Gas, combustion turbine Owns 163 MW — 100.0% Siderca SAIC
Tenaris Dalmine power station Gas, combined cycle Owns 122 MW — 100.0% Dalmine SpA
Buena Ventura wind farm Wind Owns 103 MW — 100.0% Tenaris SA

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 1

within 25 km

Projects

1

within 25 km

Nearest

16.0 km

Cassano D'Adda power station CCTG8

All 1NearbyShowing all 1 nearby project.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Announced Cassano D'Adda power station CCTG8 Gas, combined cycle 920 MW 16.0 km away nearest: Tenaris Dalmine power station

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution