TEXAS DEEPWATER DEER PARK TREML LLC, DEER PARK RAIL TERMINAL — Petroleum product terminalTexas Petrochemicals — Postponed · Gas, combined cycle · TX · 560 MW · 7.0 mi awayNET Power La Porte Station — Studied · Gas, combustion turbine · TX · 25.5 MW · 7.2 mi awayGreens Bayou 6 — Under construction · Gas, combustion turbine · TX · 445 MW · 8.4 mi awayCedar Bayou 5 — Under construction · Gas, combustion turbine · TX · 697 MW · 13.3 mi awayCPV Pondera King Energy Center — Postponed · Gas, combined cycle · TX · 900 MW · 13.8 mi away
  • Other infrastructure
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Texas Deepwater Deer Park Treml LLC

Follow this company

Petroleum product terminal owner

As filed: TEXAS DEEPWATER DEER PARK TREML LLC

Key facts

Petroleum product terminal owner · 0 projects
Projects
0projects
Assets
1
States
TX
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Assets 1

Assets

1

Assets by type
  1. Petroleum product terminal: 1 assets, 1 asset

Owns 1 petroleum product terminal

Sources EIA Energy Atlas

Sources

  • EIA Energy AtlasOpen license · retrieved Nov 13, 2026Source: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Terminals (as of September 2021)

Every source and license · Attribution

Around this company

Nearby 5

within 15 mi

Projects

5

of 9 before the technology filter

Nearest

7.0 mi

Texas Petrochemicals

5 of 9 · gas, oil and hydrogen technologiesNearbyShowing 5 of 9 nearby projects, narrowed to gas, oil and hydrogen technologies because this company operates oil or liquids infrastructure. Show all 9

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Texas Petrochemicals Gas, combined cycle 560 MW 7.0 mi away nearest: TEXAS DEEPWATER DEER PARK TREML LLC, DEER PARK RAIL TERMINAL
Studied NET Power La Porte Station Gas, combustion turbine 25.5 MW 7.2 mi away nearest: TEXAS DEEPWATER DEER PARK TREML LLC, DEER PARK RAIL TERMINAL
Under construction Greens Bayou 6 Gas, combustion turbine 445 MW 8.4 mi away nearest: TEXAS DEEPWATER DEER PARK TREML LLC, DEER PARK RAIL TERMINAL
Under construction Cedar Bayou 5 Gas, combustion turbine 697 MW 13.3 mi away nearest: TEXAS DEEPWATER DEER PARK TREML LLC, DEER PARK RAIL TERMINAL
Postponed CPV Pondera King Energy Center Gas, combined cycle 900 MW 13.8 mi away nearest: TEXAS DEEPWATER DEER PARK TREML LLC, DEER PARK RAIL TERMINAL

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Every source and license · Attribution