Gemasolar CSP solar farm — Power plant · Solar thermal · TorresolValle 1 CSP solar farm — Power plant · Solar thermal · TorresolValle 2 CSP solar farm — Power plant · Solar thermal · TorresolCartujano I solar farm -- — Solar · Spain · 50 MW · 15.9 km away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Power plant owner

Key facts

Power plant owner · 119.9 MW
Assets
3
Registered in
Spain
Parent
No parent recordedNo parent recordedLike 48,118 of 50,271 companies here. Why

Assets 3

Assets

3

Capacity

120 MW

MW by fuel
  1. Solar thermal: 120 MW, 3 assets

Operates 3 power plants · Owns 2 power plants

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Share Held by
Valle 1 CSP solar farm Solar thermal Operates and owns 50 MW — 100.0% Torresol
Valle 2 CSP solar farm Solar thermal Operates and owns 50 MW — 100.0% Torresol
Gemasolar CSP solar farm Solar thermal Operates 19.9 MW — — Torresol

Sources GEM

Sources

  • Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Open license, with credit · retrieved 26 Oct 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 1

within 25 km

Projects

1

within 25 km

Nearest

15.9 km

Cartujano I solar farm --

All 1NearbyShowing all 1 nearby project.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Announced Cartujano I solar farm -- Solar 50 MW 15.9 km away nearest: Valle 1 CSP solar farm

Sources GEM

Sources

  • Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Open license, with credit · retrieved 26 Oct 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution