Trane Pueblo — Power plant · Solar · Trane US IncWaxwing Solar CSG — Solar · CO · 3 MW · 3.5 km awayPueblo Airport Generating Station — Storage · CO · 50 MW · 4.4 km awayPueblo Airport Generating Station — Gas, combustion turbine · CO · 100 MW · 4.4 km awayStagecoach LRE — Solar · CO · 230 MW · 11.7 km awayArroyo Solar — Solar · CO · 335 MW · 13.6 km awayVestas Towers America, Inc. — Wind · CO · 3 MW · 15.1 km away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Trane US Inc

Follow this company

Power plant owner

Key facts

Power plant owner · 1.4 MW
Assets
1
States
CO
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2025 to 2025
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearSolarTotal (MWh)
20253,1443,144

Sources EIA-860 · EIA-860M · EIA

Sources

Attribution

Assets 1

Assets

1

Capacity

1.4 MW

MW by fuel
  1. Solar: 1.4 MW, 1 asset

Operates 1 power plant

Around this company

Nearby 6

within 25 km

Projects

6

within 25 km

Nearest

3.5 km

Waxwing Solar CSG

All 6NearbyShowing all 6 nearby projects. They fill 5 rows, as a project's generator units share a row.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first: 5 rows for the nearest of 6.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Under construction Waxwing Solar CSG Solar 3 MW 3.5 km away nearest: Trane Pueblo
Studied Pueblo Airport Generating Station × 2 units Storage 150 MW 4.4 km away nearest: Trane Pueblo
Permitted Stagecoach LRE Solar 230 MW 11.7 km away nearest: Trane Pueblo
Under construction Arroyo Solar Solar 335 MW 13.6 km away nearest: Trane Pueblo
Postponed Vestas Towers America, Inc. Wind 3 MW 15.1 km away nearest: Trane Pueblo

Sources EIA-860M · Berkeley Lab

Sources

  • EIA-860M Preliminary Monthly Electric Generator InventoryOpen license · retrieved 4 Nov 2026
  • LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)Open license, with credit · retrieved 4 Nov 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.

Every source and license · Attribution