UNEV Pipeline — Petroleum product pipeline · UNEV PIPELINEMoapa Paiute Energy Center — Postponed · Gas, combined cycle · NV · 1,210 MW · 0.7 mi awayKennecott Power Plant — Postponed · Gas, combined cycle · UT · 214.3 MW · 3.5 mi away
  • Other infrastructure
  • 10 · 100 · 1,000 MW

UNEV Pipeline

Follow this company

Petroleum product pipeline operator

As filed: UNEV PIPELINE

Key facts

Petroleum product pipeline operator · 436 miles
Pipeline and line held
436miles
Assets
1
States
NV, UT
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,120 of 50,273 companies here. Why

Assets 1

Assets

1

Assets by type
  1. Petroleum product pipeline: 1 assets, 1 asset

Operates 1 petroleum product pipeline

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z Miles. Sort by length, largest first State. Sort by state, A to Z Held by
UNEV Pipeline Petroleum product pipeline Operates 436 miles US-NV, US-UT UNEV PIPELINE

Sources EIA Energy Atlas

Sources

  • EIA Energy AtlasOpen license · retrieved Nov 9, 2026Source: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Pipelines (as of January 2020)

Every source and license · Attribution

Around this company

Nearby 2

within 15 mi

Projects

2

of 29 before the technology filter

Nearest

0.7 mi

Moapa Paiute Energy Center

2 of 29 · gas, oil and hydrogen technologiesNearbyShowing 2 of 29 nearby projects, narrowed to gas, oil and hydrogen technologies because this company operates oil or liquids infrastructure. Show all 29

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Moapa Paiute Energy Center Gas, combined cycle 1,210 MW 0.7 mi away nearest: UNEV Pipeline
Postponed Kennecott Power Plant Gas, combined cycle 214.3 MW 3.5 mi away nearest: UNEV Pipeline

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution