Cape Cod Air Force Station - 6 SWS — Power plant · Wind · US Space ForceCanal — Gas, combustion turbine · MA · 330 MW · 3.1 km awaySolar Carver 1 Hybrid — Solar + storage · MA · 4 MW · 19.5 km awaySolar Carver 3 Hybrid — Solar + storage · MA · 2 MW · 21.6 km away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

US Space Force

Follow this company

Public agency

Key facts

Public agency · 3.4 MW
Assets
1
States
MA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,118 of 50,271 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2014 to 2026
  • Wind
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearWindTotal (MWh)
2026 (part year)3,8033,803
20256,5796,579
20244,6314,631
20237,0437,043
20228,2468,246
20217,9887,988
20208,6278,627
20196,3156,315
20187,9967,996
20179,2359,235
20168,9908,990
20158,3228,322
20147,8347,834

Sources EIA-860 · EIA-860M · EIA

Sources

Attribution

Assets 1

Assets

1

Capacity

3.4 MW

MW by fuel
  1. Wind: 3.4 MW, 1 asset

Operates 1 power plant

Sources EIA-860M · GEM

Sources

Every source and license · Attribution

Around this company

Nearby 3

within 25 km

Projects

3

within 25 km

Nearest

3.1 km

Canal

All 3NearbyShowing all 3 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Canal Gas, combustion turbine 330 MW 3.1 km away nearest: Cape Cod Air Force Station - 6 SWS
Under construction Solar Carver 1 Hybrid Solar + storage 4 MW 19.5 km away nearest: Cape Cod Air Force Station - 6 SWS
Under construction Solar Carver 3 Hybrid Solar + storage 2 MW 21.6 km away nearest: Cape Cod Air Force Station - 6 SWS