Webster Solar — Power plant · Solar · Webster Solar, LLCPutnam Meadow Solar Station — Filed · Solar · CT · 4 MW · 9.2 mi awayKCE CT 1, LLC — Announced · Storage · CT · 45 MW · 10.3 mi awaySouthbridge Landfill Gas-to-Energy — Postponed · Biomass · MA · 1.6 MW · 10.7 mi awayKillingly Energy Center — Postponed · Gas, combined cycle · CT · 843 MW · 11.9 mi awayTaft BESS — Under construction · Storage · MA · 200 MW · 12.7 mi awaySturbridge Road Solar — Under construction · Solar · MA · 5 MW · 13.3 mi away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Webster Solar

Follow this company

Independent power producer

Key facts

Independent power producer · 1 MW
Assets
1
Projects
1
States
MA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2021 to 2025
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearSolarTotal (MWh)
20251,2461,246
20241,2721,272
20231,2481,248
20221,3511,351
20211,2431,243

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Projects 1

Projects

1

all statuses

Capacity

0.01 GW

none active

Projects sponsored by this company, sorted by capacity, largest first.
Status Name. Sort by name, A to Z Type MW, sorted descending. Sort by capacity, smallest first State Online. Sort by proposed online date, latest first Source
Postponed Webster Solar Solar 5.4 MW SC — EIA-860M

Sources EIA-860M

Sources

  • EIA-860M1 projectretrieved Nov 4, 2026

Every source and license · Attribution

Around this company

Nearby 6

within 15 mi

Projects

6

within 15 mi

Nearest

9.2 mi

Putnam Meadow Solar Station

All 6NearbyShowing all 6 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Filed Putnam Meadow Solar Station Solar 4 MW 9.2 mi away nearest: Webster Solar
Announced KCE CT 1, LLC Storage 45 MW 10.3 mi away nearest: Webster Solar
Postponed Southbridge Landfill Gas-to-Energy Biomass 1.6 MW 10.7 mi away nearest: Webster Solar
Postponed Killingly Energy Center Gas, combined cycle 843 MW 11.9 mi away nearest: Webster Solar
Under construction Taft BESS Storage 200 MW 12.7 mi away nearest: Webster Solar
Under construction Sturbridge Road Solar Solar 5 MW 13.3 mi away nearest: Webster Solar

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution