Westside Solar Power PV1 — Power plant · Solar · Westside Assets LLCGrape — Under construction · Solar · CA · 246.4 MW · 5.1 mi awayCherry — Permitted · Solar + storage · CA · 359.7 MW · 6.7 mi awaySand Luis West — Permitted · Solar + storage · CA · 156.3 MW · 8.9 mi awayKey Energy Storage — Under construction · Storage · CA · 300.1 MW · 13.7 mi away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Westside Assets LLC

Follow this company

Independent power producer

Key facts

Independent power producer · 2 MW
Assets
1
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2016 to 2024
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearSolarTotal (MWh)
20244,8544,854
20234,6474,647
20225,1865,186
20215,0265,026
20204,7394,739
20194,7714,771
20184,8174,817
20175,0425,042
2016 (part year)3,2643,264

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 1

Assets

1

Capacity

2.0 MW

MW by fuel
  1. Solar: 2.0 MW, 1 asset

Operates 1 power plant

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 4

within 15 mi

Projects

4

within 15 mi

Nearest

5.1 mi

Grape

All 4NearbyShowing all 4 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Under construction Grape Solar 246.4 MW 5.1 mi away nearest: Westside Solar Power PV1
Permitted Cherry Solar + storage 359.7 MW 6.7 mi away nearest: Westside Solar Power PV1
Permitted Sand Luis West Solar + storage 156.3 MW 8.9 mi away nearest: Westside Solar Power PV1
Under construction Key Energy Storage Storage 300.1 MW 13.7 mi away nearest: Westside Solar Power PV1

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO

Every source and license · Attribution