- Combustion
- Operating
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
- Other companies nearby
1 asset
1 asset. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Xilinx, Inc.
Power plant owner
Key facts
Power plant owner · 1 MW- Assets
- 1
- States
- CA
- Headquarters
- San Jose, United States Source: Wikidata
- LEI
- 6EY4K7ZMF9UX1CU6KC79 Source: Wikidata
- Wikipedia
- English article Source: Wikidata
- Parent
- No parent recordedNo parent recordedLike 48,118 of 50,271 companies here. Why
Gross output of plants with a stake
1 of 1 plantOutputGross: each plant's whole output, whatever the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.0% of the output is from 0 plants recorded as wholly owned.No equity share: 1 stake of 1 not stated, and none is assumed.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Gas
Yearly totals
| Year | Gas | Total (MWh) |
|---|---|---|
| 2025 | 8,459 | 8,459 |
| 2024 | 8,296 | 8,296 |
| 2023 | 6,537 | 6,537 |
| 2022 | 6,344 | 6,344 |
| 2021 | 7,169 | 7,169 |
| 2020 | 8,135 | 8,135 |
| 2019 | 8,327 | 8,327 |
| 2018 | 7,704 | 7,704 |
| 2017 | 7,689 | 7,689 |
| 2016 | 5,548 | 5,548 |
| 2015 | 6,365 | 6,365 |
| 2014 | 6,307 | 6,307 |
| 2013 | 7,816 | 7,816 |
| 2012 (part year) | 7,050 | 7,050 |
Sources EIA-860 · EIA-860M · EIA
Sources
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
Assets 1
Assets
1
Capacity
1.0 MW
- Gas, other: 1.0 MW, 1 asset
Owns 1 power plant
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Held by |
|---|---|---|---|---|---|
| Xilinx San Jose | Gas, other | Owns | 1 MW | US-CA | Xilinx, Inc. |
Sources 2
Registers
2
Reuse terms
- 2 Open license
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 16
within 25 kmProjects
16
within 25 km
Nearest
9.7 km
Data Center
All 16NearbyShowing all 16 nearby projects.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Filed | Data Center | Large load | — | 9.7 km away | nearest: Xilinx San Jose |
| Filed | DC-N (San Jose data centre) | Large load | — | 10.1 km away | nearest: Xilinx San Jose |
| Built | SKYBOX DATA CENTER | Large load | — | 12.3 km away | nearest: Xilinx San Jose |
| Filed | 1200 Memorex Skybox Data Center | Large load | — | 12.6 km away | nearest: Xilinx San Jose |
| Built | PRIME DATA CENTERS | Large load | — | 12.9 km away | nearest: Xilinx San Jose |
| Built | 4054 Digital Realty | Large load | — | 13.4 km away | nearest: Xilinx San Jose |
| Filed | Equinix SV-19 - 131 Great Oaks Blvd SJ | Large load | — | 13.6 km away | nearest: Xilinx San Jose |
| Unknown | CHINA MOBILE INTERNATIONAL SAN JOSE DATA CENTER | Large load | — | 13.6 km away | nearest: Xilinx San Jose |
| Under construction | Kifer BESS 1 | Storage | 50 MW | 13.8 km away | nearest: Xilinx San Jose |
| Unknown | VANTAGE DATA CENTERS MANAGEMENT CO , LLC | Large load | — | 13.9 km away | nearest: Xilinx San Jose |
| Unknown | SV8 DATA CENTER | Large load | — | 14.2 km away | nearest: Xilinx San Jose |
| Filed | LBA Data Center West | Large load | — | 14.3 km away | nearest: Xilinx San Jose |
| Filed | Edgecore -3580 | Large load | — | 14.8 km away | nearest: Xilinx San Jose |
| Unknown | EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT | Large load | — | 14.9 km away | nearest: Xilinx San Jose |
| Filed | 888 Ross Data Center | Large load | — | 18.6 km away | nearest: Xilinx San Jose |
| Unknown | SJC02 & SJC03 DATA CENTER | Large load | — | 19.0 km away | nearest: Xilinx San Jose |
Sources FAA OE/AAA · EPA ICIS-NPDES · EIA-860M · CAISO · EPA ICIS-Air
Sources
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- CAISO Public Queue ReportSource: California ISO
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)