Show on map
Map
Anna Solar: the source's site coordinate and 14 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Anna Solar
Solar
- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Interconnection queue
- Duke Energy Carolinas (DUK)
- Location
- Vance County, North Carolina
Details
Who’s behind it
- Developer
- Sunlight Partners
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar Photovoltaic”
- EIA plant
- 60176 generator PV1
Timeline
- Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Jordan Solar Postponed | Solar | 2.4 km | 5 |
| Izia Solar Postponed | Solar | 6.0 km | 5 |
| Brooke Solar Postponed | Solar | 7.6 km | 4.5 |
| Christina Solar Postponed | Solar | 9.3 km | 3 |
| Spring Valley Farm Postponed | Solar | 14.0 km | 5 |
| BRE NC Solar 2 Postponed | Solar | 14.0 km | 5 |
| Blue Bird Solar Postponed | Solar | 14.0 km | 4 |
| BRE NC Solar 4 Postponed | Solar | 16.3 km | 5 |
| Bloomsbury Solar, LLC Postponed | Solar | 18.7 km | 5 |
| Cardinal Solar Postponed | Solar | 19.4 km | 5 |
| Hawk Solar Postponed | Solar | 20.6 km | 5 |
| Cabaniss Solar Postponed | Solar | 21.1 km | 4.2 |
| Louisburg Solar Postponed | Solar | 21.6 km | 5 |
| Roman Solar Postponed | Solar | 22.5 km | 5 |