Bellefield 2 Solar & Energy Storage Farm
Solar + storage
Key facts
Solar + storage Under construction (source status: (V) Under construction, more than 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Queue position
- 1631
- In-service date
- (stated)
- Location
- Kern County, California
Sources
-
View at source →
EIA-860M · 2 records (64209-26SBB, 64209-26SBA)
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
-
View at source →
CAISO ·
CAISO Public Queue Report
Source: California ISO · license
CAISO Terms of Use (rev. 2025-05-14), retrieved 2026-09-12 — "No material or information from this Website ... may be copied, reproduced, republished ... except (i) as authorized in these Terms of Use"; and "may be used by you provided that you keep intact all copyright ... notices and that you credit the California ISO"
Summary only: the source’s license keeps the full record at the source.
Units and requests (3)
How these combine
This project is one site. Each row is one unit or request a register lists for it: a generator in EIA-860M, a stage in NESO’s register, a request in a grid queue. Capacity is the live interconnection requests’ MW added up where there are any, plus any listed generator of a technology no request covers; otherwise the generators’ MW added up. The status is the most advanced any row reports; a withdrawn row ends the project only when no other row carries it on.
| Source | Record | Name | Technology | MW | Status | Proposed COD |
|---|---|---|---|---|---|---|
| CAISO Request | — | BELLEFIELD 2 SOLAR FARM | Solar + storage | 500 | Contracted | Jun 30, 2027 |
| EIA-860M Generator | 64209-26SBB | Bellefield 2 Solar & Energy Storage Farm | Storage | 500 | Under construction “(V) Under construction, more than 50 percent complete” | Dec 1, 2026 |
| EIA-860M Generator | 64209-26SBA | Bellefield 2 Solar & Energy Storage Farm | Solar | 500 | Under construction “(V) Under construction, more than 50 percent complete” | Dec 1, 2026 |