Show on map
- Wind & solar
- Storage
- In development
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
Bellefield 2 Solar & Energy Storage Farm: the source's site coordinate and 9 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Bellefield 2 Solar & Energy Storage Farm
Solar + storage
Key facts
Solar + storage Under construction (source status: (V) Under construction, more than 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Queue position
- 1631
- In-service date
- (stated)
- Location
- Kern County, California
Details
Who’s behind it
- Developer
- 26SB 8me LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Capacity (MW)
- 500 Capacity is the interconnection request in CAISO Public Queue Report. The 2 generators listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 1,000 MW nameplate.
- Connects at
- Windhub Substation 220kVConnection point500 MW active (1 of 5 projects).
- EIA plant
- 64209 2 generatorsEIA generatorsPlant 64209 26SBA, 26SBB
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesAround this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Sanborn Hybrid 3 Under construction | Solar + storage | 3.0 mi | 1,400 |
| Aratina Solar Center 2 Under construction | Solar + storage | 3.3 mi | 200 |
| Bellefield 3 Solar and Battery Storage Contracted | Solar + storage | 4.4 mi | 150 |
| Tehachapi Spindle Withdrawn | Storage | 7.4 mi | 20 |
| Willow Rock Energy Storage Center Contracted | Storage | 8.8 mi | 500 |
| Bolthouse Solar LLC Postponed | Solar | 10.4 mi | 3 |
| Windhub Solar B, LLC Under construction | Solar | 11.4 mi | 26.4 |
| Big Creek Solar LLC Under construction | Solar | 11.7 mi | 400 |
| Syracuse and Tours Renewable Energy Permitted | Solar + storage | 14.3 mi | 80 |