Show on map
Wensowitch Solar ParkBluebonnet Prairie Wind — Under construction · Wind · TX · 180 MW · 11.6 mi awayElm Flats Solar — Under construction · Solar + storage · TX · 375.8 MW · 13.5 mi away
  • Wind & solar
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Wensowitch Solar Park

Solar

Capacity
Capacity: sourceERCOT · Open licenseMW
In-service date
(stated)
Location
Navarro County, Texas

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar - Photovoltaic Solar”
Capacity (MW)
146.1 Capacity is the interconnection request in ERCOT GIS Report (Generator Interconnection Status). The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 145.6 MW nameplate.
Connects at
Tapping 138 kV line Telico (192) to Montfort Switch (3454)Connection point146.1 MW active (1 of 1 projects).
EIA plant
67567 generator WEGSP

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as permitted in EIA-860M (source status: “(T) Regulatory approvals received. Not under construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Bluebonnet Prairie Wind Under construction Wind 11.6 mi 180
Elm Flats Solar Under construction Solar + storage 13.5 mi 375.8

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution