Exact site not public
Map
Bulls Lodge Farm 2 in United Kingdom: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Bulls Lodge Farm 2
Solar + storage
No longer listedNo longer listedNo longer listed in any register since .
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-002737
- In-service date
- (stated)
- Location
- Braintree 400kV Substation, United Kingdom (exact site not stated)EstimateEstimated from the connection substation. The source names the connection substation, not the site. Source: NESO. How we estimate →
Details
Who’s behind it
- Developer
- 548 UK Investment Holdings Limited
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar + storage source: “Energy Storage System;PV Array (Photo Voltaic/solar)”
- Connects at
- Braintree 400kV SubstationConnection point1,713.9 MW active (7 of 7 projects).
At this site
2 records at Bulls Lodge Farm 2At this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Bulls Lodge Farm 2 this record | Solar + storage | 350 | Filed |
| Another phase medium confidence | Bulls Lodge Farm | Solar + storage | 200 | Filed |
Also at this interconnection point (5)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- Braintree Solar + storage, 1,000 MW, filed at Braintree 400kV Substation
- Braintree Solar + storage, 57 MW, permitted at Braintree 400kV Substation
- Braintree Solar + storage, 49.9 MW, permitted at Braintree 400kV Substation
- Braintree (Tertiary) Solar + storage, 49.9 MW, permitted at Braintree 400kV Substation
- Braintree Solar + storage, 7.1 MW, permitted at Braintree 400kV Substation
Sources NESO
Supported by National Energy SO Open Data
Timeline
- Stated In-service date stated by NESO.
- No longer in NESO's report (reason not stated).
- Observed as filed in NESO (source status: “Scoping”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data