Bulls Lodge Farm 2

Solar + storage

No longer listedNo longer listedNo longer listed in any register since .

Capacity
Capacity: sourceNESO · Open license, with creditMW
Queue position
PRO-002737
In-service date
(stated)
Location
Braintree 400kV Substation, United Kingdom (exact site not stated)EstimateEstimated from the connection substation. The source names the connection substation, not the site. Source: NESO. How we estimate →

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar + storage source: “Energy Storage System;PV Array (Photo Voltaic/solar)”
Connects at
Braintree 400kV SubstationConnection point1,713.9 MW active (7 of 7 projects).

At this site

2 records at Bulls Lodge Farm 2At this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Bulls Lodge Farm 2 this record Solar + storage 350 Filed
Another phase medium confidence Bulls Lodge Farm Solar + storage 200 Filed
Also at this interconnection point (5)

Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.

  • Braintree Solar + storage, 1,000 MW, filed at Braintree 400kV Substation
  • Braintree Solar + storage, 57 MW, permitted at Braintree 400kV Substation
  • Braintree Solar + storage, 49.9 MW, permitted at Braintree 400kV Substation
  • Braintree (Tertiary) Solar + storage, 49.9 MW, permitted at Braintree 400kV Substation
  • Braintree Solar + storage, 7.1 MW, permitted at Braintree 400kV Substation

Sources NESO

Supported by National Energy SO Open Data

Sources

  • NESOTerms of use · retrieved Nov 18, 2026Supported by National Energy SO Open Data

Attribution

Timeline

  • Stated In-service date stated by NESO.
  • No longer in NESO's report (reason not stated).
  • Observed as filed in NESO (source status: “Scoping”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources NESO

Supported by National Energy SO Open Data

Sources

  • NESOOpen license, with credit · retrieved Nov 11, 2026Supported by National Energy SO Open Data

Every source and license · Attribution

View at source

Report a problem