Bulls Lodge Farm 2

Site of 2 records

Company 548 UK Investment Holdings Limited

Lead filing
Bulls Lodge Farm 2
Grouped by
the same grid connection point and developer
Active (MW)
550 across 2
Built (MW)
0 across 0
Withdrawn or canceled (MW)
0 across 0
EIA plant ID
—
Connects at
Braintree 400kV Substation
Operating plant
—

1. Records at this site

Records at this site: the lead first; each EIA plant's units follow its first unit; every other record with its relationship to the lead, its confidence, technology, capacity, status and company.
RelationshipConfidenceNameTechnologyMWStatusCompany
Lead filing — Bulls Lodge Farm 2 Solar + storage 350 Filed 548 UK Investment Holdings Limited
Another phase medium Bulls Lodge Farm Solar + storage 200 Filed 548 UK Investment Holdings Limited

2. Also at this interconnection point

5 other requests at the same grid connection point

From another or no named developer: they share the connection, not the site.

Other requests at this site's grid connection points, active first, each by capacity, with the company that filed it.
NameCompanyTechnologyMWStatusConnects at
Braintree Braintree 10 Renewables Limited Solar + storage 1,000 Filed Braintree 400kV Substation
Braintree Pivoted Power LLP Solar + storage 57 Permitted Braintree 400kV Substation
Braintree Pivoted Power LLP Solar + storage 49.9 Permitted Braintree 400kV Substation
Braintree (Tertiary) CSE22 Limited Solar + storage 49.9 Permitted Braintree 400kV Substation
Braintree Pivoted Power LLP Solar + storage 7.1 Permitted Braintree 400kV Substation

3. Sources

Sources NESO

Supported by National Energy SO Open Data

Sources

  • NESOTerms of use · retrieved Nov 18, 2026Supported by National Energy SO Open Data