Bumpers Farm BESS phase 1
Storage
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-002103
- Location
- Amersham Main 132kV Substation, United Kingdom (exact site not stated)EstimateEstimated from the connection substation. The source names the connection substation, not the site. Source: NESO. How we estimate →
Details
Who’s behind it
- Developer
- Harmony BF Ltd
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage source: “Energy Storage System”
- Connects at
- Amersham Main 132kV SubstationConnection point125.3 MW active (1 of 3 projects).
At this site
2 records at Bumpers Farm BESS phase 1At this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Bumpers Farm BESS phase 1 this record | Storage | 49.5 | Built |
| Another phase high confidence | Bumpers Farm BESS phase 2 | Storage | 49.5 | Built |
Also at this interconnection point (1)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- Vox Charlie Storage, 125.3 MW, filed at Amersham Main 132kV Substation
Sources NESO
Supported by National Energy SO Open Data
Timeline
- Observed as built in NESO (source status: “Built”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.