Bumpers Farm BESS phase 1

Site of 2 records

Company Harmony BF Ltd

Lead filing
Bumpers Farm BESS phase 1
Grouped by
the same grid connection point and developer
Active (MW)
0 across 0
Built (MW)
99 across 2
Withdrawn or canceled (MW)
0 across 0
EIA plant ID
—
Connects at
Amersham Main 132kV Substation
Operating plant
—

1. Records at this site

Records at this site: the lead first; each EIA plant's units follow its first unit; every other record with its relationship to the lead, its confidence, technology, capacity, status and company.
RelationshipConfidenceNameTechnologyMWStatusCompany
Lead filing — Bumpers Farm BESS phase 1 Storage 49.5 Built Harmony BF Ltd
Another phase high Bumpers Farm BESS phase 2 Storage 49.5 Built Harmony BF Ltd

2. Also at this interconnection point

1 other request at the same grid connection point

From another or no named developer: they share the connection, not the site.

Other requests at this site's grid connection points, active first, each by capacity, with the company that filed it.
NameCompanyTechnologyMWStatusConnects at
Vox Charlie Vox Charlie Ltd Storage 125.3 Filed Amersham Main 132kV Substation