Show on map

Exact site not public

Canella Solar Farm

Solar + storage

As filed: CANELLA SOLAR FARM

Key facts

Solar + storage Withdrawn (what this status means)
Capacity
Capacity: sourceCAISO · Open license, with creditMW
In-service date
(stated)
Location
KERN County, California (exact site not public)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Connects at
Windhub Substation 230kVConnection point1,300 MW active (4 of 28 projects).

At this site

2 records at CANELLA SOLAR FARMAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing CANELLA SOLAR FARM this record Solar + storage 300 Withdrawn
Another phase medium confidence CANELLA 2 SOLAR FARM Solar + storage 200 Withdrawn
Also at this interconnection point (26)

Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.

Sources CAISO ยท EIA-860M

Sources

Attribution

Timeline

  • Observed as withdrawn in CAISO.
  • Stated In-service date stated by CAISO.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources CAISO

Sources

  • CAISOOpen license, with credit · retrieved Nov 19, 2026Source: California ISO

Every source and license · Attribution

View at source

Report a problem