Canella Solar Farm
Solar + storage
As filed: CANELLA SOLAR FARM
- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- Queue position
- 1331
- In-service date
- (stated)
- Location
- KERN County, California (exact site not public)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Connects at
- Windhub Substation 230kVConnection point1,300 MW active (4 of 28 projects).
At this site
2 records at CANELLA SOLAR FARMAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | CANELLA SOLAR FARM this record | Solar + storage | 300 | Withdrawn |
| Another phase medium confidence | CANELLA 2 SOLAR FARM | Solar + storage | 200 | Withdrawn |
Also at this interconnection point (26)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- SANBORN 5 HYBRID Solar, 550 MW, contracted at Windhub Substation 230kV
- SANBORN SOLAR 2 Solar + storage, 500 MW, contracted at Windhub Substation 230kV
- Bellefield 3 Solar and Battery Storage Solar + storage, 150 MW, contracted at Windhub Substation 230kV
- SANBORN HYBRID 4 Solar + storage, 100 MW, contracted at Windhub Substation 230kV
- Bellefield Solar and Energy Storage Farm Solar + storage, 500 MW, built at Windhub Substation 230kV
- VOYAGER WIND 2 Wind, 500 MW, built at Windhub Substation 230kV
- EDSAN 2 Solar + storage, 500 MW, built at Windhub Substation 230kV
- EDSAN 1 Solar + storage, 300 MW, built at Windhub Substation 230kV
- RISING TREE WIND FARM (FKA HOMESTEAD WIND FARM) Wind, 198 MW, built at Windhub Substation 230kV
- PV-47 Solar, 700 MW, withdrawn at Windhub Substation 230kV
- PV-48 Solar, 700 MW, withdrawn at Windhub Substation 230kV
- CALIFORNIA CITY SOLAR Solar, 700 MW, withdrawn at Windhub Substation 230kV
- GOLDEN HILLS POWER Gas, combined cycle, 550 MW, withdrawn at Windhub Substation 230kV
- BISON PEAK Pumped hydro storage, 500 MW, withdrawn at Windhub Substation 230kV
- CREOSOTE Solar, 400 MW, withdrawn at Windhub Substation 230kV
- LONGHORN 1 Solar + storage, 400 MW, withdrawn at Windhub Substation 230kV
- WEST MOJAVE ENERGY Solar, 350 MW, withdrawn at Windhub Substation 230kV
- TENASKA MOUNTAIN BASIN Gas, reciprocating engine, 300 MW, withdrawn at Windhub Substation 230kV
- LOOP RANCH WIND Wind, 299 MW, withdrawn at Windhub Substation 230kV
- FLYING WING SOLAR (FKA GENESIS SOLAR) Solar, 250 MW, withdrawn at Windhub Substation 230kV
- ALTA 20 WIND Wind, 250 MW, withdrawn at Windhub Substation 230kV
- MOJAVE VIEW SOLAR Solar, 200 MW, withdrawn at Windhub Substation 230kV
- GARCES HYBRID SOLAR Solar + storage, 200 MW, withdrawn at Windhub Substation 230kV
- ORO VERDE SOLAR PROJECT (FKA GATEWAY SOLAR ENERGY PROJECT) Solar, 150 MW, withdrawn at Windhub Substation 230kV
- ALTA 1 STORAGE Storage, 150 MW, withdrawn at Windhub Substation 230kV
- DESERT FLOWER WIND FARM Wind, 85 MW, withdrawn at Windhub Substation 230kV
Timeline
- Observed as withdrawn in CAISO.
- Stated In-service date stated by CAISO.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources CAISO