Bellefield 3 Solar and Battery Storage
Solar + storage
- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Queue position
- 1779
- In-service date
- (stated)
- Location
- Kern County, California
Details
Who’s behind it
- Developer
- 51LV 8me, LLC
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Capacity (MW)
- 150 Capacity is the interconnection request in CAISO Public Queue Report. The 2 generators listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 300 MW nameplate.
- Connects at
- Windhub Substation 230kVConnection point1,300 MW active (4 of 28 projects).
- EIA plant
- 67894 2 generatorsEIA generatorsPlant 67894 51LVA, 51LVB
At this site
2 records at Bellefield Solar and Energy Storage FarmAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Bellefield Solar and Energy Storage Farm | Solar + storage | 500 | Built |
| Another phase medium confidence | Bellefield 3 Solar and Battery Storage this record | Solar + storage | 150 | Contracted |
Also at this interconnection point (26)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- SANBORN 5 HYBRID Solar, 550 MW, contracted at Windhub Substation 230kV
- SANBORN SOLAR 2 Solar + storage, 500 MW, contracted at Windhub Substation 230kV
- SANBORN HYBRID 4 Solar + storage, 100 MW, contracted at Windhub Substation 230kV
- VOYAGER WIND 2 Wind, 500 MW, built at Windhub Substation 230kV
- EDSAN 2 Solar + storage, 500 MW, built at Windhub Substation 230kV
- EDSAN 1 Solar + storage, 300 MW, built at Windhub Substation 230kV
- RISING TREE WIND FARM (FKA HOMESTEAD WIND FARM) Wind, 198 MW, built at Windhub Substation 230kV
- PV-47 Solar, 700 MW, withdrawn at Windhub Substation 230kV
- PV-48 Solar, 700 MW, withdrawn at Windhub Substation 230kV
- CALIFORNIA CITY SOLAR Solar, 700 MW, withdrawn at Windhub Substation 230kV
- GOLDEN HILLS POWER Gas, combined cycle, 550 MW, withdrawn at Windhub Substation 230kV
- BISON PEAK Pumped hydro storage, 500 MW, withdrawn at Windhub Substation 230kV
- CREOSOTE Solar, 400 MW, withdrawn at Windhub Substation 230kV
- LONGHORN 1 Solar + storage, 400 MW, withdrawn at Windhub Substation 230kV
- WEST MOJAVE ENERGY Solar, 350 MW, withdrawn at Windhub Substation 230kV
- TENASKA MOUNTAIN BASIN Gas, reciprocating engine, 300 MW, withdrawn at Windhub Substation 230kV
- CANELLA SOLAR FARM Solar + storage, 300 MW, withdrawn at Windhub Substation 230kV
- LOOP RANCH WIND Wind, 299 MW, withdrawn at Windhub Substation 230kV
- FLYING WING SOLAR (FKA GENESIS SOLAR) Solar, 250 MW, withdrawn at Windhub Substation 230kV
- ALTA 20 WIND Wind, 250 MW, withdrawn at Windhub Substation 230kV
- MOJAVE VIEW SOLAR Solar, 200 MW, withdrawn at Windhub Substation 230kV
- CANELLA 2 SOLAR FARM Solar + storage, 200 MW, withdrawn at Windhub Substation 230kV
- GARCES HYBRID SOLAR Solar + storage, 200 MW, withdrawn at Windhub Substation 230kV
- ORO VERDE SOLAR PROJECT (FKA GATEWAY SOLAR ENERGY PROJECT) Solar, 150 MW, withdrawn at Windhub Substation 230kV
- ALTA 1 STORAGE Storage, 150 MW, withdrawn at Windhub Substation 230kV
- DESERT FLOWER WIND FARM Wind, 85 MW, withdrawn at Windhub Substation 230kV
Timeline
- Stated In-service date stated by CAISO.
- Observed as contracted in CAISO.
- CAISO Public Queue Report: Proposed cod 2028-02-27 → 2030-04-30.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesAround this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Bellefield 2 Solar & Energy Storage Farm Under construction | Solar + storage | 4.4 mi | 500 |
| Aratina Solar Center 2 Under construction | Solar + storage | 5.9 mi | 200 |
| Sanborn Hybrid 3 Under construction | Solar + storage | 7.2 mi | 1,400 |
| Bolthouse Solar LLC Postponed | Solar | 8.0 mi | 3 |
| Big Creek Solar LLC Under construction | Solar | 11.1 mi | 400 |
| Tehachapi Spindle Withdrawn | Storage | 11.5 mi | 20 |
| Willow Rock Energy Storage Center Contracted | Storage | 12.3 mi | 500 |