Bellefield 3 Solar and Battery StorageBellefield 2 Solar & Energy Storage Farm — Under construction · Solar + storage · CA · 500 MW · 4.4 mi awayAratina Solar Center 2 — Under construction · Solar + storage · CA · 200 MW · 5.9 mi awaySanborn Hybrid 3 — Under construction · Solar + storage · CA · 1,400 MW · 7.2 mi awayBolthouse Solar LLC — Postponed · Solar · CA · 3 MW · 8.0 mi awayBig Creek Solar LLC — Under construction · Solar · AR · 400 MW · 11.1 mi awayTehachapi Spindle — Withdrawn · Storage · CA · 20 MW · 11.5 mi awayWillow Rock Energy Storage Center — Contracted · Storage · CA · 500 MW · 12.3 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Bellefield 3 Solar and Battery Storage

Solar + storage

Key facts

Solar + storage Contracted (what this status means)
Capacity
Capacity: sourceEIA-860M · Open licenseMW
In-service date
(stated)
Location
Kern County, California

Details

Who’s behind it

Developer
51LV 8me, LLC

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Capacity (MW)
150 Capacity is the interconnection request in CAISO Public Queue Report. The 2 generators listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 300 MW nameplate.
Connects at
Windhub Substation 230kVConnection point1,300 MW active (4 of 28 projects).
EIA plant
67894 2 generatorsEIA generatorsPlant 67894 51LVA, 51LVB

At this site

2 records at Bellefield Solar and Energy Storage FarmAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Bellefield Solar and Energy Storage Farm Solar + storage 500 Built
Another phase medium confidence Bellefield 3 Solar and Battery Storage this record Solar + storage 150 Contracted
Also at this interconnection point (26)

Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.

Sources EIA-860M · CAISO

Sources

Attribution

Timeline

  • Stated In-service date stated by CAISO.
  • Observed as contracted in CAISO.
  • CAISO Public Queue Report: Proposed cod 2028-02-27 → 2030-04-30.
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 22, 2026Source: California ISO

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Bellefield 2 Solar & Energy Storage Farm Under construction Solar + storage 4.4 mi 500
Aratina Solar Center 2 Under construction Solar + storage 5.9 mi 200
Sanborn Hybrid 3 Under construction Solar + storage 7.2 mi 1,400
Bolthouse Solar LLC Postponed Solar 8.0 mi 3
Big Creek Solar LLC Under construction Solar 11.1 mi 400
Tehachapi Spindle Withdrawn Storage 11.5 mi 20
Willow Rock Energy Storage Center Contracted Storage 12.3 mi 500

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 22, 2026Source: California ISO

Attribution