Solar + storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
In-service date
(stated)
Location
SAN BERNARDINO County, California (exact site not public)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Capacity (MW)
300 Capacity is the interconnection request in CAISO Public Queue Report. The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 449 MW nameplate.
Connects at
Kramer Substation 230kVConnection point750 MW active (4 of 17 projects).
EIA plant
64852

At this site

2 records at Daggett 3At this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Daggett 3 this record Solar + storage 300 Built
Another phase high confidence DAGGETT SOLAR 2 Solar + storage 182 Built
Also at this interconnection point (15)

Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.

Sources EIA-860M · CAISO

Sources

Attribution

Timeline

  • Observed as built in EIA-860M (source status: “Operating (EIA-860M operating generator inventory)”).
  • Stated In-service date stated by CAISO.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Oct 25, 2026
  • CAISOOpen license, with credit · retrieved Nov 16, 2026Source: California ISO

Every source and license · Attribution

View at source

Report a problem