Aratina Solar Center 2Bellefield 2 Solar & Energy Storage Farm — Under construction · Solar + storage · CA · 500 MW · 3.3 mi awaySanborn Hybrid 3 — Under construction · Solar + storage · CA · 1,400 MW · 4.9 mi awayBellefield 3 Solar and Battery Storage — Contracted · Solar + storage · CA · 150 MW · 5.9 mi awayTehachapi Spindle — Withdrawn · Storage · CA · 20 MW · 6.2 mi awayBolthouse Solar LLC — Postponed · Solar · CA · 3 MW · 8.8 mi awayWindhub Solar B, LLC — Under construction · Solar · CA · 26.4 MW · 10.9 mi awayWillow Rock Energy Storage Center — Contracted · Storage · CA · 500 MW · 11.1 mi awaySyracuse and Tours Renewable Energy — Permitted · Solar + storage · CA · 80 MW · 14.7 mi awayBig Creek Solar LLC — Under construction · Solar · AR · 400 MW · 15.0 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Aratina Solar Center 2

Solar + storage

Capacity
Capacity: sourceCAISO · Open license, with creditMW
In-service date
(stated)
Location
Kern County, California

Details

Who’s behind it

Developer
45MG 8me LLC

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Capacity (MW)
200 Capacity is the interconnection request in CAISO Public Queue Report. The 2 generators listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 263 MW nameplate.
Connects at
Kramer Substation 230kVConnection point750 MW active (4 of 17 projects).
EIA plant
64215 2 generatorsEIA generatorsPlant 64215 45MGA, 45MGB

At this site

2 records at Aratina Solar Center 2At this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Aratina Solar Center 2 this record Solar + storage 200 Under construction
Another phase high confidence ARATINA SOLAR CENTER 1 Solar + storage 200 Contracted
Also at this interconnection point (15)

Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.

Sources EIA-860M · CAISO

Sources

Attribution

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as under construction in EIA-860M (source status: “(TS) Construction complete, but not yet in commercial operation”).
  • EIA-860M Preliminary Monthly Electric Generator Inventory: Status raw (V) Under construction, more than 50 percent complete → (TS) Construction complete, but not yet in commercial operation.
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 23, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Bellefield 2 Solar & Energy Storage Farm Under construction Solar + storage 3.3 mi 500
Sanborn Hybrid 3 Under construction Solar + storage 4.9 mi 1,400
Bellefield 3 Solar and Battery Storage Contracted Solar + storage 5.9 mi 150
Tehachapi Spindle Withdrawn Storage 6.2 mi 20
Bolthouse Solar LLC Postponed Solar 8.8 mi 3
Windhub Solar B, LLC Under construction Solar 10.9 mi 26.4
Willow Rock Energy Storage Center Contracted Storage 11.1 mi 500
Syracuse and Tours Renewable Energy Permitted Solar + storage 14.7 mi 80
Big Creek Solar LLC Under construction Solar 15.0 mi 400

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 23, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution