Show on map
- Loads
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Loads
- Operating
- Size not stated
FAIRVIEW DATA CENTER: the source's site coordinate and 12 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Fairview Data Center
Data center
As filed: FAIRVIEW DATA CENTER
- Kind
- Data center
- Location
- Hennepin County, Minnesota
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Data center source: “Data Center”
- Capacity (MW)
- Not stated
- Selected as a data center because the facility name says data center. EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
Timeline
- Observed as built in EPA ICIS-Air (source status: “Operating”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EPA ICIS-Air
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| SUPERCOMPUTER LLC Built | Large load | 2.7 mi | |
| HB FULLER CO - DATA CENTER - ARDEN HILLS Built | Large load | 5.5 mi | |
| TC Solar RCE Postponed | Solar | 7.0 mi | 1 |
| FIS GLOBAL Built | Large load | 10.2 mi | |
| OPTUM TECHNOLOGY Built | Large load | 10.2 mi | |
| IRON GATE DATA CENTERS - EAGAN Built | Large load | 10.8 mi | |
| DATABANK - EAGAN - MSP2 Built | Large load | 11.4 mi | |
| DATA RECOGNITION CORP Built | Large load | 12.1 mi | |
| Black Dog Postponed | Gas, combined cycle | 12.6 mi | 760 |
| EAGAN 5 MW DATA CENTER Built | Large load | 12.8 mi | |
| DATABANK MSP3 Built | Large load | 13.0 mi | |
| Dakota Solar Postponed | Solar | 15.0 mi | 3 |
Sources EPA ICIS-Air · EIA-860M