Dunside Wind Farm (Formally Fallago Rig 2 Wind Farm)Brunta Hill wind farm -- — Wind · 18.4 MW · 7.3 km awayCrystal Rig solar farm -- — Announced · Solar · 27.5 MW · 8.7 km awayFerneylea Farm wind farm -- — Canceled · Wind · 18 MW · 13.3 km awayCorsbie Moor wind farm -- — Wind · 27 MW · 14.7 km awayBlackburn Mill Farm, Grantshouse wind farm -- — Announced · Wind · 16.8 MW · 15.6 km awayBlackburn wind farm -- — Canceled · Wind · 21 MW · 16.0 km awayMonashee (Element Power) wind farm -- — Canceled · Wind · 15 MW · 16.4 km awayMonashee (West Cost Windfarms Ltd) wind farm -- — Canceled · Wind · 15 MW · 17.5 km awayKinegar Quarry wind farm 2 — Announced · Wind · 5 MW · 18.2 km awayHowpark solar project -- — Announced · Solar · 15 MW · 18.6 km awayMuircleugh Farm III wind farm -- — Canceled · Wind · 21 MW · 19.2 km awayMuircleugh Farm wind farm -- — Canceled · Wind · 21 MW · 19.2 km awayMuircleugh Farm II wind farm -- — Canceled · Wind · 4 MW · 19.7 km awayHowpark Farm wind farm -- — Under construction · Wind · 16 MW · 19.9 km awayGilston Hill wind farm -- — Wind · 21 MW · 20.6 km awayGilston (Borders) wind farm -- — Wind · 14.4 MW · 20.7 km awayGilston (Lothian) wind farm -- — Wind · 18.5 MW · 20.7 km awaySell Moor wind farm -- — Canceled · Wind · 47.5 MW · 21.6 km awayShaw Park wind farm -- — Wind · 20.7 MW · 21.7 km awayLongpark wind farm 2 — Canceled · Wind · 14 MW · 23.8 km away
  • Wind & solar
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Dunside Wind Farm (Formally Fallago Rig 2 Wind Farm)

Wind

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Queue position
PRO-000526
In-service date
(stated)
Location
Scotland, United Kingdom

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Wind source: “Wind Onshore”
Capacity (MW)
100 Capacity is the interconnection request in NESO Transmission Entry Capacity (TEC) Register. The 1 generator listed in Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) (listed under Sources) total 108 MW nameplate.
Connects at
Fallago 400/33kVConnection point149.5 MW active (2 of 3 projects).

Timeline

  • Stated In-service date stated by NESO.
  • Observed as studied in NESO (source status: “Awaiting Consents”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources GEM · NESO

Supported by National Energy SO Open Data

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • NESOOpen license, with credit · retrieved Nov 13, 2026Supported by National Energy SO Open Data

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Brunta Hill wind farm -- Unknown Wind 7.3 km 18.4
Crystal Rig solar farm -- Announced Solar 8.7 km 27.5
Ferneylea Farm wind farm -- Canceled Wind 13.3 km 18
Corsbie Moor wind farm -- Unknown Wind 14.7 km 27
Blackburn Mill Farm, Grantshouse wind farm -- Announced Wind 15.6 km 16.8
Blackburn wind farm -- Canceled Wind 16.0 km 21
Monashee (Element Power) wind farm -- Canceled Wind 16.4 km 15
Monashee (West Cost Windfarms Ltd) wind farm -- Canceled Wind 17.5 km 15
Kinegar Quarry wind farm 2 Announced Wind 18.2 km 5
Howpark solar project -- Announced Solar 18.6 km 15
Muircleugh Farm III wind farm -- Canceled Wind 19.2 km 21
Muircleugh Farm wind farm -- Canceled Wind 19.2 km 21
Muircleugh Farm II wind farm -- Canceled Wind 19.7 km 4
Howpark Farm wind farm -- Under construction Wind 19.9 km 16
Gilston Hill wind farm -- Unknown Wind 20.6 km 21
Gilston (Borders) wind farm -- Unknown Wind 20.7 km 14.4
Gilston (Lothian) wind farm -- Unknown Wind 20.7 km 18.5
Sell Moor wind farm -- Canceled Wind 21.6 km 47.5
Shaw Park wind farm -- Unknown Wind 21.7 km 20.7
Longpark wind farm 2 Canceled Wind 23.8 km 14

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution