Gilston Hill wind farm --: the source's site coordinate and 20 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Gilston Hill wind farm --
Wind
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Scotland, United Kingdom
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Wind source: “wind / Onshore”
Timeline
- Observed as unknown in GEM (source status: “shelved”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Gilston (Borders) wind farm -- Unknown | Wind | 2.1 km | 14.4 |
| Gilston (Lothian) wind farm -- Unknown | Wind | 2.1 km | 18.5 |
| Muircleugh Farm II wind farm -- Canceled | Wind | 13.0 km | 4 |
| Sell Moor wind farm -- Canceled | Wind | 13.5 km | 47.5 |
| Shaw Park wind farm -- Unknown | Wind | 13.6 km | 20.7 |
| Muircleugh Farm III wind farm -- Canceled | Wind | 13.7 km | 21 |
| Muircleugh Farm wind farm -- Canceled | Wind | 13.7 km | 21 |
| Longpark wind farm 2 Canceled | Wind | 15.0 km | 14 |
| Blinkbonny Heights wind farm -- Canceled | Wind | 17.2 km | 4.6 |
| Mount Lothian II wind farm -- Canceled | Wind | 17.3 km | 20.7 |
| Mount Lothian wind farm -- Canceled | Wind | 17.3 km | 20.7 |
| Brunta Hill wind farm -- Unknown | Wind | 17.4 km | 18.4 |
| Cockenzie power station New Plant Canceled | Coal | 18.5 km | 1,152 |
| Scawd Law Wind Farm Filed | Wind + storage | 18.9 km | 64 |
| Corsbie Moor wind farm -- Unknown | Wind | 19.3 km | 27 |
| Spurlens Rig wind farm -- Canceled | Wind | 19.6 km | 12 |
| Easter Bush solar farm -- Under construction | Solar | 20.1 km | 3 |
| Dunside Wind Farm (Formally Fallago Rig 2 Wind Farm) Studied | Wind | 20.6 km | 100 |
| Crystal Rig solar farm -- Announced | Solar | 22.8 km | 27.5 |
| Kilrubie wind farm -- Canceled | Wind | 23.8 km | 21 |
Supported by National Energy SO Open Data
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.