Eggborough CCGT - OCGT - BESSWeeland Road Kellingley solar project -- — Announced · Solar · 10 MW · 5.3 km awayScalm Park wind farm -- — Canceled · Wind · 17.5 MW · 8.9 km awaySiniat Kirkhaw Lane solar project -- — Announced · Solar · 2.9 MW · 9.9 km awayCleek Hall wind farm -- — Canceled · Wind · 15 MW · 10.5 km awayDarrington Quarry wind farm -- — Canceled · Wind · 16 MW · 10.7 km awayWoodcock Sweeming Lane solar project -- — Announced · Solar · 18.5 MW · 12.1 km awayPontefract wind farm -- — Wind · 12 MW · 12.6 km awayFenwick Solar Project — Filed · Solar + storage · 237.5 MW · 14.9 km awayElmsall Way South Elmsall Solar Panels -- — Under construction · Solar · 3 MW · 15.7 km awayFinlay Beverages Elmsall Way solar project -- — Announced · Solar · 1.6 MW · 15.7 km awayRedmoor Farm solar farm -- — Solar · 25.5 MW · 17.3 km awayRedmoor solar farm -- — Canceled · Solar · 26 MW · 17.3 km awayHowdens Joinery Thorpe Road solar project -- — Announced · Solar · 2.9 MW · 18.8 km awayOld River Don wind farm -- — Canceled · Wind · 18 MW · 20.3 km awayIkea Distribution Centre solar farm 2 — Announced · Solar · 2 MW · 20.5 km awayPhoenix Healthcare Distribution Centre solar project -- — Announced · Solar · 3.2 MW · 20.5 km awayHeadways Unit 3 solar project -- — Announced · Solar · 1 MW · 21.3 km awayKirkgate Lane Felkirk solar project -- — Announced · Solar · 10 MW · 21.6 km awaySkelton Grange Landfill Site Pontefract Lane solar farm -- — Announced · Solar · 4.4 MW · 22.2 km awayPark Springs Long Royd solar project -- — Announced · Solar · 3.1 MW · 23.0 km awayAmazon UK Skelton Moor Road Solar Panels -- — Announced · Solar · 1.7 MW · 24.9 km away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Eggborough CCGT - OCGT - BESS

Gas, combined cycle

Capacity
Capacity: sourceNESO · Open license, with creditMW
Queue position
PRO-000136-1, PRO-000136-2
In-service date
(stated)
Location
England, United Kingdom

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Gas, combined cycle source: “CCGT (Combined Cycle Gas Turbine);Energy Storage System;OCGT (Open Cycle Gas Turbine)”
Capacity (MW)
2,450 Capacity is the interconnection request in NESO Transmission Entry Capacity (TEC) Register. The 1 generator listed in Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) (listed under Sources) total 730 MW nameplate.
Connects at
Eggborough 400kV SubstationConnection point3,000 MW active (2 of 2 projects).

Timeline

  • Observed as studied in NESO (source status: “Awaiting Consents”).
  • Stated In-service date stated by NESO.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources NESO · GEM

Supported by National Energy SO Open Data

Sources

  • NESOOpen license, with credit · retrieved Nov 18, 2026Supported by National Energy SO Open Data
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Weeland Road Kellingley solar project -- Announced Solar 5.3 km 10
Scalm Park wind farm -- Canceled Wind 8.9 km 17.5
Siniat Kirkhaw Lane solar project -- Announced Solar 9.9 km 2.9
Cleek Hall wind farm -- Canceled Wind 10.5 km 15
Darrington Quarry wind farm -- Canceled Wind 10.7 km 16
Woodcock Sweeming Lane solar project -- Announced Solar 12.1 km 18.5
Pontefract wind farm -- Unknown Wind 12.6 km 12
Fenwick Solar Project Filed Solar + storage 14.9 km 237.5
Elmsall Way South Elmsall Solar Panels -- Under construction Solar 15.7 km 3
Finlay Beverages Elmsall Way solar project -- Announced Solar 15.7 km 1.6
Redmoor Farm solar farm -- Unknown Solar 17.3 km 25.5
Redmoor solar farm -- Canceled Solar 17.3 km 26
Howdens Joinery Thorpe Road solar project -- Announced Solar 18.8 km 2.9
Old River Don wind farm -- Canceled Wind 20.3 km 18
Ikea Distribution Centre solar farm 2 Announced Solar 20.5 km 2
Phoenix Healthcare Distribution Centre solar project -- Announced Solar 20.5 km 3.2
Headways Unit 3 solar project -- Announced Solar 21.3 km 1
Kirkgate Lane Felkirk solar project -- Announced Solar 21.6 km 10
Skelton Grange Landfill Site Pontefract Lane solar farm -- Announced Solar 22.2 km 4.4
Park Springs Long Royd solar project -- Announced Solar 23.0 km 3.1
Amazon UK Skelton Moor Road Solar Panels -- Announced Solar 24.9 km 1.7

Sources GEM · NESO

Supported by National Energy SO Open Data

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • NESOOpen license, with credit · retrieved Nov 18, 2026Supported by National Energy SO Open Data

Attribution