Show on map
Redmoor solar farm --Redmoor Farm solar farm -- — Solar · 25.5 MW · 0.0 km awayCleek Hall wind farm -- — Canceled · Wind · 15 MW · 7.3 km awayElvington Water Treatment Works solar project -- — Announced · Solar · 3 MW · 10.2 km awayScalm Park wind farm -- — Canceled · Wind · 17.5 MW · 12.3 km awayHowdens Joinery Thorpe Road solar project -- — Announced · Solar · 2.9 MW · 12.7 km awayWoodcock Sweeming Lane solar project -- — Announced · Solar · 18.5 MW · 15.4 km awayGallymoor Landfill Site wind farm -- — Announced · Wind · 1.8 MW · 16.7 km awayNorth Farm Wind Turbines, Thorpe Le Street - Wind Turbine -- — Announced · Wind · 1 MW · 16.8 km awayEggborough CCGT - OCGT - BESS — Studied · Gas, combined cycle · 2,450 MW · 17.3 km awayHarewood Whin Tinker Lane solar farm -- — Announced · Solar · 28 MW · 18.9 km awayYorkshire Grown Produce Main Road solar project -- — Announced · Solar · 1.5 MW · 20.5 km awayHessay solar farm -- — Announced · Solar · 40 MW · 20.9 km awayWeeland Road Kellingley solar project -- — Announced · Solar · 10 MW · 20.9 km awaySiniat Kirkhaw Lane solar project -- — Announced · Solar · 2.9 MW · 23.5 km away
  • Combustion
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Redmoor solar farm --

Solar

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
England, United Kingdom

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “utility-scale solar / Assumed PV”

At this site

2 records at Redmoor Farm solar farm --At this siteGrouped by the same exact location and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Redmoor Farm solar farm -- Solar 25.5 Unknown
Earlier filing, superseded low confidence Redmoor solar farm -- this record Solar 26 Canceled

Sources GEM

Sources

  • GEMTerms of use · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution

Timeline

  • Observed as canceled in GEM (source status: “cancelled”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Redmoor Farm solar farm -- Unknown Solar 0.0 km 25.5
Cleek Hall wind farm -- Canceled Wind 7.3 km 15
Elvington Water Treatment Works solar project -- Announced Solar 10.2 km 3
Scalm Park wind farm -- Canceled Wind 12.3 km 17.5
Howdens Joinery Thorpe Road solar project -- Announced Solar 12.7 km 2.9
Woodcock Sweeming Lane solar project -- Announced Solar 15.4 km 18.5
Gallymoor Landfill Site wind farm -- Announced Wind 16.7 km 1.8
North Farm Wind Turbines, Thorpe Le Street - Wind Turbine -- Announced Wind 16.8 km 1
Eggborough CCGT - OCGT - BESS Studied Gas, combined cycle 17.3 km 2,450
Harewood Whin Tinker Lane solar farm -- Announced Solar 18.9 km 28
Yorkshire Grown Produce Main Road solar project -- Announced Solar 20.5 km 1.5
Hessay solar farm -- Announced Solar 20.9 km 40
Weeland Road Kellingley solar project -- Announced Solar 20.9 km 10
Siniat Kirkhaw Lane solar project -- Announced Solar 23.5 km 2.9

Sources GEM · NESO

Supported by National Energy SO Open Data

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • NESOOpen license, with credit · retrieved Nov 13, 2026Supported by National Energy SO Open Data

Attribution