Show on map
Longhorn HoldingsGum Swamp Solar, LLC — Under construction · Solar · NC · 80 MW · 7.3 mi awayCrawford Solar — Postponed · Solar · NC · 5 MW · 11.0 mi awayAMAZON DATA SERVICES, INC. - ENERGY WAY TECH CAMPUS — Built · Large load · NC · 11.5 mi awayScotch Grove Solar — Filed · Solar · NC · 80 MW · 12.8 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Longhorn Holdings

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Interconnection queue
Duke Energy Carolinas (DUK)
Location
Richmond County, North Carolina

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
58781 generator PV1

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Gum Swamp Solar, LLC Under construction Solar 7.3 mi 80
Crawford Solar Postponed Solar 11.0 mi 5
AMAZON DATA SERVICES, INC. - ENERGY WAY TECH CAMPUS Built Large load 11.5 mi
Scotch Grove Solar Filed Solar 12.8 mi 80

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution