Ironwood Solar
Solar + storage
Key facts
Solar + storage Under construction (source status: (TS) Construction complete, but not yet in commercial operation) (what this status means)- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- Queue position
- 1435
- In-service date
- (stated)
- Location
- Yuma County, Arizona
Details
Who’s behind it
- Developer
- Arizona Public Service Co · part of Pinnacle West Capital CorpOwnership claimOwnership link recorded from its source; no date stated by the source.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Capacity (MW)
- 250 Capacity is the interconnection request in CAISO Public Queue Report. The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 168 MW nameplate.
- Connects at
- Hoodoo Wash Switchyard 500 kVConnection point1,570 MW active (6 of 13 projects).
- EIA plant
- 68397 generator I168M
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as under construction in EIA-860M (source status: “(TS) Construction complete, but not yet in commercial operation”).
- EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-11-01 → 2026-12-01.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesAround this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Elisabeth Solar Filed | Solar | 5.5 mi | 350 |
| Agua Caliente Solar Project Postponed | Solar | 6.4 mi | 290 |
Sources EIA-860M