Show on map
OTM-J Data Center Building JBuilding K (Silver Springs data centre) — Filed · Large load · NV · 0.5 mi awayOTM-R Data Center Building R — Filed · Large load · NV · 0.5 mi awayBuilding A (Silver Springs data centre) — Filed · Large load · NV · 0.6 mi awayOTM-D Data Center Building D — Filed · Large load · NV · 1.0 mi awayTesla Reno GigaFactory — Under construction · Solar · NV · 1 MW · 11.9 mi awayTesla Reno GigaFactory — Postponed · Solar · NV · 10.4 MW · 11.9 mi awayMaxim Crane 6257 Edgecore RN01 Sparks — Filed · Large load · NV · 12.7 mi awayBZI Crane (BTS 107) (Sparks data centre) — Filed · Large load · NV · 13.2 mi awayPeru Ridge - Data Center Building 1 — Filed · Large load · NV · 13.8 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Size not stated
  • 10 · 100 · 1,000 MW

OTM-J Data Center Building J

Data center

Kind
Data center
Location
Lyon County, Nevada

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Data center source: “Data Center”
Capacity (MW)
Not stated
Local approvals PremiumComing soon: moratoriums, zoning votes and hearings for a site's county and city. Join for early access.

Timeline

  • Observed as filed in FAA OE/AAA (source status: “Determined - No Hazard”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources FAA OE/AAA

Sources

  • FAA OE/AAAOpen license · retrieved Nov 16, 2026

Every source and license · Attribution

View at source

Local government activity · LocalGovIndex Meeting records by GovData Systems

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Building K (Silver Springs data centre) Filed Large load 0.5 mi
OTM-R Data Center Building R Filed Large load 0.5 mi
Building A (Silver Springs data centre) Filed Large load 0.6 mi
OTM-D Data Center Building D Filed Large load 1.0 mi
Tesla Reno GigaFactory Under construction Solar 11.9 mi 1
Tesla Reno GigaFactory Postponed Solar 11.9 mi 10.4
Maxim Crane 6257 Edgecore RN01 Sparks Filed Large load 12.7 mi
BZI Crane (BTS 107) (Sparks data centre) Filed Large load 13.2 mi
Peru Ridge - Data Center Building 1 Filed Large load 13.8 mi

Sources FAA OE/AAA · EIA-860M

Sources

  • FAA OE/AAAOpen license · retrieved Nov 16, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution