Show on map

Exact site not public

Northern Orchard Solar 2

Solar

As filed: NORTHERN ORCHARD SOLAR 2

Capacity
Capacity: sourceCAISO · Open license, with creditMW
Location
KERN County, California (exact site not public)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Connects at
Midway-Wheeler Ridge #2 230 kV LineConnection point100 MW active (1 of 5 projects).

At this site

2 records at NORTHERN ORCHARD SOLARAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing NORTHERN ORCHARD SOLAR Solar + storage 100 Built
Another phase medium confidence NORTHERN ORCHARD SOLAR 2 this record Solar 50 Built
Also at this interconnection point (3)

Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.

  • KYAN SOLAR Solar, 100 MW, contracted at Midway-Wheeler Ridge #2 230 kV Line
  • HELIOS SECONDUS Solar, 229.2 MW, withdrawn at Midway-Wheeler Ridge #2 230 kV Line
  • FAMILIA HYBRID SOLAR Solar + storage, 200 MW, withdrawn at Midway-Wheeler Ridge #2 230 kV Line

Sources CAISO

Sources

Attribution

Timeline

  • Observed as built in CAISO.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources CAISO

Sources

  • CAISOOpen license, with credit · retrieved Nov 19, 2026Source: California ISO

Every source and license · Attribution

View at source