Exact site not public
Map
NORTHERN ORCHARD SOLAR 2 in California: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Northern Orchard Solar 2
Solar
As filed: NORTHERN ORCHARD SOLAR 2
- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- Queue position
- 1259
- Location
- KERN County, California (exact site not public)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Connects at
- Midway-Wheeler Ridge #2 230 kV LineConnection point100 MW active (1 of 5 projects).
At this site
2 records at NORTHERN ORCHARD SOLARAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | NORTHERN ORCHARD SOLAR | Solar + storage | 100 | Built |
| Another phase medium confidence | NORTHERN ORCHARD SOLAR 2 this record | Solar | 50 | Built |
Also at this interconnection point (3)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- KYAN SOLAR Solar, 100 MW, contracted at Midway-Wheeler Ridge #2 230 kV Line
- HELIOS SECONDUS Solar, 229.2 MW, withdrawn at Midway-Wheeler Ridge #2 230 kV Line
- FAMILIA HYBRID SOLAR Solar + storage, 200 MW, withdrawn at Midway-Wheeler Ridge #2 230 kV Line
Sources CAISO
Timeline
- Observed as built in CAISO.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources CAISO