Northern Orchard Solar

Site of 2 records

Company not recorded

Lead filing
NORTHERN ORCHARD SOLAR
Grouped by
the same grid connection point and project name
Active (MW)
0 across 0
Built (MW)
150 across 2
Withdrawn or canceled (MW)
0 across 0
EIA plant ID
—
Connects at
Midway-Wheeler Ridge #2 230 kV Line
Operating plant
—

1. Records at this site

Records at this site: the lead first; each EIA plant's units follow its first unit; every other record with its relationship to the lead, its confidence, technology, capacity, status and company.
RelationshipConfidenceNameTechnologyMWStatusCompany
Lead filing — NORTHERN ORCHARD SOLAR Solar + storage 100 Built —
Another phase medium NORTHERN ORCHARD SOLAR 2 Solar 50 Built —

2. Also at this interconnection point

3 other requests at the same grid connection point

From another or no named developer: they share the connection, not the site.

Other requests at this site's grid connection points, active first, each by capacity, with the company that filed it.
NameCompanyTechnologyMWStatusConnects at
KYAN SOLAR — Solar 100 Contracted Midway-Wheeler Ridge #2 230 kV Line
HELIOS SECONDUS — Solar 229.2 Withdrawn Midway-Wheeler Ridge #2 230 kV Line
FAMILIA HYBRID SOLAR — Solar + storage 200 Withdrawn Midway-Wheeler Ridge #2 230 kV Line

3. Sources

Sources CAISO

Sources

Attribution