Show on map
PHX01 / PHX02 / PHX03 / PHX05APS - ALIGNED ENERGY DATA CENTER — Built · Large load · AZ · 0.3 mi awayAmex Odyssey (Phoenix data centre) — Filed · Large load · AZ · 8.5 mi away11:11 Data Center — Filed · Large load · AZ · 11.1 mi awayDesert Bloom — Under construction · Storage · AZ · 150 MW · 12.6 mi awayCompass Datacenter — Under construction · Large load · AZ · 13.8 mi awayMICROSOFT CORP - OLIVE AVE — Built · Large load · AZ · 14.5 mi awayMicrosoft Phx 83 (El Mirage data centre) — Filed · Large load · AZ · 14.8 mi awayQTS 40th Street — Filed · Large load · AZ · 14.9 mi awayMCDOWELL ROAD DATA CENTER — Built · Large load · AZ · 14.9 mi away
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

PHX01 / PHX02 / PHX03 / PHX05

Data center

Kind
Data center
Location
Maricopa County, Arizona

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Data center source: “Data Center”
Capacity (MW)
Not stated
  • Selected as a data center because its industry code is NAICS 518210 (data processing and hosting). Some sites with this code are offices with a server room: 39 of 49 checked by hand were data centers. EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)

Timeline

  • Observed as built in EPA ICIS-Air (source status: “Operating”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EPA ICIS-Air

Sources

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
APS - ALIGNED ENERGY DATA CENTER Built Large load 0.3 mi
Amex Odyssey (Phoenix data centre) Filed Large load 8.5 mi
11:11 Data Center Filed Large load 11.1 mi
Desert Bloom Under construction Storage 12.6 mi 150
Compass Datacenter Under construction Large load 13.8 mi
MICROSOFT CORP - OLIVE AVE Built Large load 14.5 mi
Microsoft Phx 83 (El Mirage data centre) Filed Large load 14.8 mi
QTS 40th Street Filed Large load 14.9 mi
MCDOWELL ROAD DATA CENTER Built Large load 14.9 mi