Pioneer Path Energy Storage 1
Storage
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 27INR0418
- In-service date
- (stated)
- Location
- Robertson County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →
Details
Who’s behind it
- Developer
- Tempus Power management LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage source: “Other - Battery Energy Storage”
- Connects at
- Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2Connection point817.1 MW active (8 of 8 projects).
At this site
8 records at Pioneer Path Energy Storage 1At this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Pioneer Path Energy Storage 1 this record | Storage | 102.1 | Studied |
| Another phase high confidence | Pioneer Path Energy Storage 2 | Storage | 102.1 | Studied |
| Another phase high confidence | Pioneer Path Energy Storage 3 | Storage | 102.1 | Studied |
| Same site, relation unclear low confidence | Prairie Horizon Energy Storage 1 | Storage | 102.1 | Studied |
| Another phase high confidence | Pioneer Path Energy Storage 4 | Storage | 102.1 | Studied |
| Same site, relation unclear low confidence | Prairie Horizon Energy Storage 2 | Storage | 102.1 | Studied |
| Same site, relation unclear low confidence | Prairie Horizon Energy Storage 3 | Storage | 102.1 | Studied |
| Same site, relation unclear low confidence | Prairie Horizon Energy Storage 4 | Storage | 102.1 | Studied |
Sources ERCOT
Timeline
- Stated In-service date stated by ERCOT.
- Observed as studied in ERCOT (source status: “Active”).
- ERCOT GIS Report (Generator Interconnection Status): Proposed cod 2027-12-01 → 2028-12-01.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.